Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | recovered_inst | / | Complete | ||||||||||||||
2 | recovered_inst | / | Complete | ||||||||||||||
3 | recovered_inst | 146 | 146 | 0 | 0 | 0 | 0 | 3,476 | 87 / | 1 | Complete | ||||||
4 | recovered_inst | 206 | 206 | 0 | 0 | 0 | 0 | 1,975 | 10,800 | 87 / | 1 | Complete | |||||
5 | telemetered | 179 | 57 | 0 | 98 | 3 | 24 | 1,268 | 89 / | 2 | 2 | 1 | Complete | ||||
5 | recovered_inst | / | Complete | ||||||||||||||
6 | recovered_inst | 178 | 178 | 0 | 0 | 0 | 0 | 2,712 | 87 / | 1 | Complete | ||||||
7 | recovered_host | 180 | 150 | 0 | 0 | 2 | 31 | 1,394 | 87 / | 1 | Complete | ||||||
7 | recovered_inst | / | Complete |
Deployment: | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
---|---|---|---|---|---|---|---|
32% | |||||||
83% | |||||||
100% | 100% | 100% |
Deployment: | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
---|---|---|---|---|---|---|---|
3 | 0.00 | ||||||
4 | 0.46 | 0.00 | |||||
5 | 0.21 | 0.27 | 0.00 | ||||
6 | 0.61 | 0.17 | 0.40 | 0.00 | |||
7 | 0.17 | 0.29 | 0.08 | 0.44 | 0.00 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
CE07SHSM-MFD35 |
8/11/16, 8:00 PM | 9/26/16, 8:00 PM |
The Power System Controller on CE07SHSM indicates the power connection to the MFN short-circuited on 2016-08-12 at 23:30 UTC. Failure is indicated by decreased voltage (70 VDC instead of 380 VDC) and increased current draw (1900 mA instead of 120 mA) to the CVT. This symptom is indicative of a short-circuit in the power lines of either the stretch hose (most likely) or EM Chain. In the past, this failure has been associated with a failed stretch hose. Have disabled all further power and communications with the MFN. This means no more telemetered data from: ADCPT2, VEL3D, CTDBP2 + DOSTA, PRESF, PCO2W, PHSEN2, OPTAA2, ZPLSC Id: 908 By: michaesm |
CE07SHSM-MFD35-06-PHSEND000 |
8/11/16, 8:00 PM | 9/26/16, 8:00 PM |
The Power System Controller on CE07SHSM indicates the power connection to the MFN short-circuited on 2016-08-12 at 23:30 UTC. Failure is indicated by decreased voltage (70 VDC instead of 380 VDC) and increased current draw (1900 mA instead of 120 mA) to the CVT. This symptom is indicative of a short-circuit in the power lines of either the stretch hose (most likely) or EM Chain. In the past, this failure has been associated with a failed stretch hose. Have disabled all further power and communications with the MFN. Therefore, there is no telemetered data for this reference designator.
Id: 915
By: michaesm
|
CE07SHSM-MFD35-06-PHSEND000 |
10/12/16, 8:00 PM | 4/12/17, 8:00 PM |
DCL35 stopped reporting data on 2016-10-13 04:26 UTC. The MPEA indicates the system is booting up and drawing current, but it is not fully booting up and powering on the instruments. There will no longer be any telemetered data for this instrument.
Id: 916
By: michaesm
|
CE07SHSM |
12/1/17, 9:35 AM | 3/25/18, 3:09 PM |
Data loss due to a power system failure. The mooring stopped receiving power from photo voltaic panel 1 of 4 on Nov-2. By Nov-20, the mooring stopped receiving power from two more solar panels (PV2 & PV4) and one of two wind turbines (WT2). This indicates the Power System Controller (PSC) they connect to is failing. Mooring components will be shut down as the mooring loses the ability to recharge its batteries.
Id: 1237
By: crisien
|
CE07SHSM-MFD35-06-PHSEND000 |
4/29/19, 6:35 AM | 10/10/19, 5:07 PM |
UPDATED, 2019-10-12: Confirmed upon recovery, the instrument was flooded. *Within a week of deployment, the instrument exhibited behavior consistent with flooding, a QA issue we have experienced with the SAMI sensors. Power to the instrument was disabled. No further data will be collected for the remainder of the deployment.
Id: 1689
By: wingardc
|
CE07SHSM-MFD35 Method: telemetered |
5/25/19, 8:40 AM | 10/10/19, 5:07 PM |
The high voltage power supply providing power to the seafloor dataloggers and instrumentation failed for reasons unknown at this time. No further telemetered data will be available for this deployment.
Id: 1690
By: wingardc
|
CE07SHSM-MFD35 Method: recovered-host |
5/25/19, 8:40 AM | 10/10/19, 5:07 PM |
The high voltage power supply providing power to the seafloor dataloggers and instrumentation failed for reasons unknown at this time. No further telemetered data will be available for this deployment.
Id: 1749
By: wingardc
|
CE07SHSM-MFD35 Method: telemetered |
11/20/19, 1:45 PM | 12/4/19, 10:20 PM |
Due to reduced power on the mooring (limited recharging of the batteries with light winds and low levels of sunlight), we have had to reduce the operating schedule of the seafloor platform. Normally we run the system hourly, but have reduced that schedule to every 3 hours. Id: 1832 By: wingardc |
CE07SHSM-MFD35 Method: telemetered |
12/25/19, 11:45 PM |
Power to the seafloor sensors failed. With the exception of the VEL3D and OPTAA, the sensors on the seafloor platform should continue to autonomously sample for the remainder of deployment. Until we recover and redeploy the mooring in the spring of 2020, no further telemetered data will be available from the seafloor sensors.
Id: 1869
By: wingardc
|
|
CE07SHSM Method: telemetered |
5/13/20, 6:40 PM |
Due to a bug in the mooring telemetry system, data during this time range was not telemetered to shore. It was recorded on the mooring and instruments and will be available in the recovered data streams.
Id: 2185
By: wingardc
|
Metadata | Start Date | End Date | Comment |
---|---|---|---|
CE07SHSM-MFD35-06-PHSEND000 |
recovered instrument data for deployments 5 and 7 are missing By Leila Belabbassi, on 5/23/19 |
||
CE07SHSM-MFD35-06-PHSEND000 |
no annotation in the system to indicate that data from deployments 1 and 2 are not expected. By Leila Belabbassi, on 5/23/19 |
||
CE07SHSM-MFD35-06-PHSEND000 |
pressure coordinate missing from the data files By Leila Belabbassi, on 5/23/19 |
||
CE07SHSM-MFD35-06-PHSEND000 |
data gaps are not annotated in the system for deployments 5 and 7. By Leila Belabbassi, on 5/23/19 |