Data Concentrator Logger (DCL)

Reference Designator
CP03ISSM-MFD35-00-DCLENG000
Review Status
Engineering
Note
Depth
91.5m
Class
DCLEN (Data Concentrator Logger (DCL))
Make / Model
WHOI / Data Concentrator Logger

Dataset Reviews

No reviews found.

System Annotations

Metadata Start Date End Date Comment
CP03ISSM-MFD35
12/14/14, 1:52 PM 12/29/14, 7:00 PM

Telemetered and recovered host data are unavailabe because of ground faults on the sealoor Multi-Function Node. All communications to the instruments were shut down.

Id: 315 By: leila

CP03ISSM-MFD35-00-DCLENG000
5/8/15, 8:57 PM 10/21/15, 2:50 PM

Engineering recovered host data were not routinely captured.

Id: 444 By: leila

CP03ISSM-MFD35
2/3/17, 1:05 AM 3/29/17, 10:00 PM

All seafloor Multi-Function Node (MFD35 and MFD37) instruments have ceased data telemetry because the seafloor multi-function node had a high voltage ground fault and has been shut down to protect the instruments. Instrument on battery power will continue to collect data.

Id: 332 By: leila

CP03ISSM-MFD35
12/20/17, 4:00 AM 3/28/18, 12:56 PM

Deployment 7: Multi-Function Node failed.

Id: 334 By: leila
Flag: not_operational Exclude: No

CP03ISSM-MFD35
Method: telemetered
6/12/18, 7:05 AM 10/26/18, 3:52 PM

Data telemetry disabled due to chronic issues with power generation and management. The instruments could be revived to send data via telemetry when sufficient power is available. Note: Instruments may continue to collect data on internal battery power.

Id: 1511 By: leila

CP03ISSM-MFD35
Method: telemetered
6/12/18, 7:05 AM 10/28/18, 11:43 PM

Data telemetry disabled due to chronic issues with power generation and management. The instruments could be revived to send data via telemetry when sufficient power is available. Note: Instruments may continue to collect data on internal battery power.

Id: 1512 By: leila

CP03ISSM-MFD35
12/26/19, 7:00 PM

Deployment 11: *UPDATED 2020-06-22: As of 2020-05-05 the ISSM MFN is back online in a reduced power usage mode. All MFN instruments will be powered on and sample 4 times a day (as opposed to 6 times a day). Data from this instruments will be telemetered home with the exception of the OPTAA which will only be availabe upon recovery. *UPDATED 2020-04-27: The MFN has been offline since 2019-01-03 and no telemetered data are expected from MFN instruments for the remainder of the deployment.*MFN offline due to power shortage after WT2 failure from 12/27/2019 to 12/30/2019 and again from 1/3/2019 to 1/6/2019. Instruments with external batteries will continue to log data internally.

Id: 1877 By: cdobson

CP03ISSM
1/7/20, 7:00 PM

Deployment 11: UPDATED 2020-04-27: As of 2020-03-12 telemetered data for most instruments are being sent home via Iridium. A gap in telemetered data is expected between 2020-01-08 and 2020-03-12 and will not be backfilled but these data will be available upon recovery.* As of 2020-01-08 both fleet broadband telemetry pathways have failed and data can no longer be telemetered to shore from this mooring. Instruments will continue to log data which will be available upon recovery.

Id: 1889 By: cdobson
Flag: not_operational Exclude: No

Review Notes

No notes yet.

New Note