Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | recovered_inst | 17 | 15 | 0 | 1 | 0 | 0 | 24,053 | 10 | 7 / 7 | 1 | Complete | |||||
2 | recovered_inst | 166 | 110 | 0 | 0 | 2 | 57 | 186,138 | 10 | 7 / 7 | 1 | Complete | |||||
3 | recovered_inst | 207 | 207 | 0 | 0 | 0 | 0 | 358,292 | 10 | 7 / 7 | 1 | Complete | |||||
4 | recovered_inst | 141 | 138 | 0 | 0 | 1 | 3 | 233,693 | 10 | 7 / 7 | 1 | Complete | |||||
5 | recovered_inst | 248 | 139 | 4 | 75 | 2 | 31 | 24,087 | 7 / 7 | 2 | 2 | Complete | |||||
6 | recovered_inst | 140 | 140 | 0 | 0 | 0 | 0 | 13,347 | 900 | 7 / 7 | 1 | Complete | |||||
7 | recovered_inst | 148 | 148 | 0 | 0 | 0 | 0 | 267,468 | 10 | 7 / 7 | 1 | Complete |
Deployment: | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
---|---|---|---|---|---|---|---|
88% | 66% | 100% | 98% | 56% | 100% | 100% |
Deployment: | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
---|---|---|---|---|---|---|---|
1 | 0.00 | ||||||
2 | 0.64 | 0.00 | |||||
3 | 0.88 | 0.63 | 0.00 | ||||
4 | 0.62 | 0.03 | 0.65 | 0.00 | |||
5 | 0.04 | 0.65 | 0.91 | 0.63 | 0.00 | ||
6 | 0.60 | 0.90 | 0.64 | 0.89 | 0.64 | 0.00 | |
7 | 0.69 | 0.06 | 0.68 | 0.07 | 0.69 | 0.96 | 0.00 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
CP03ISSM-RID27-03-CTDBPC000 |
12/14/14, 1:52 PM | 12/29/14, 7:00 PM |
No recovered host data available. Id: 460 By: leila |
CP03ISSM-RID27-03-CTDBPC000 |
6/24/15, 11:48 PM | 8/13/15, 7:48 PM |
Gap under investigation.
Id: 743
By: leila
|
CP03ISSM-RID27-03-CTDBPC000 |
9/15/15, 2:03 PM | 9/23/15, 8:15 PM |
Gap under investigation.
Id: 744
By: leila
|
CP03ISSM-RID27-03-CTDBPC000 |
10/11/16, 9:39 AM | 6/15/17, 11:56 AM |
Deployment 5: Telemetered and recovered_host data are not expected. Id: 612 By: leila |
CP03ISSM-RID27-03-CTDBPC000 |
2/26/17, 4:51 PM | 3/26/17, 6:00 PM |
Gap under investigation.
Id: 746
By: leila
|
CP03ISSM-RID27-03-CTDBPC000 |
3/27/17, 12:00 PM | 3/31/17, 3:00 AM |
Gap under investigation.
Id: 747
By: leila
|
CP03ISSM-RID27-03-CTDBPC000 |
8/16/17, 11:00 AM | 8/30/17, 11:00 AM |
Gap under investigation.
Id: 745
By: leila
|
CP03ISSM-RID27 Method: telemetered |
6/17/18, 4:04 PM | 10/26/18, 3:52 PM |
Data telemetry disabled due to chronic issues with power generation and management. The instruments could be revived to send data via telemetry when sufficient power is available. Note: Instruments may continue to collect data on internal battery power. Id: 1509 By: leila |
CP03ISSM-RID27-03-CTDBPC000 |
6/17/18, 8:00 PM | 10/26/18, 3:52 PM |
Deployment 8: The CTDBP on the NSIF failed on 6/18/2018. No telemetered or recovered data is expected after this date. Id: 1766 By: cdobson |
CP03ISSM |
1/7/20, 7:00 PM |
Deployment 11: UPDATED 2020-04-27: As of 2020-03-12 telemetered data for most instruments are being sent home via Iridium. A gap in telemetered data is expected between 2020-01-08 and 2020-03-12 and will not be backfilled but these data will be available upon recovery.* As of 2020-01-08 both fleet broadband telemetry pathways have failed and data can no longer be telemetered to shore from this mooring. Instruments will continue to log data which will be available upon recovery.
Id: 1889
By: cdobson
|
Metadata | Start Date | End Date | Comment |
---|---|---|---|
CP03ISSM-RID27-03-CTDBPC000 |
for all deployments data on from different recovery methods cannot be compared because the timestamps do not match. By Leila Belabbassi, on 2/28/19 |
||
CP03ISSM-RID27-03-CTDBPC000 Deployment: 2 |
annotation IDs: 743 & 744 for the 2 gaps identified in the data are incomplete. By Leila Belabbassi, on 2/28/19 |
||
CP03ISSM-RID27-03-CTDBPC000 Deployment: 4 |
3 days gap right before the end-date of deployment are not annotated in the system. By Leila Belabbassi, on 2/28/19 |
||
CP03ISSM-RID27-03-CTDBPC000 Deployment: 5 |
Annotation Ids: 746 & 747 need to be updated in the system to explain the gaps identified in the data. Other gaps at the start and end of the deployment are not annotated in the system. By Leila Belabbassi, on 2/28/19 |
||
CP03ISSM-RID27-03-CTDBPC000 Deployment: 6 |
change in the sampling rate from 10 to 900 s By Leila Belabbassi, on 2/28/19 |