No reviews found.
Metadata | Start Date | End Date | Comment |
---|---|---|---|
CP04OSSM Method: telemetered |
10/22/15, 3:38 PM | 5/13/16, 1:18 PM |
Fuel cell impacted available instrument power, so telemetered data are not available or reliable. Recovered data are available for instruments that could record internally. Id: 1362 By: leila |
CP04OSSM-MFD35 |
10/16/16, 8:00 PM | 4/2/17, 9:00 PM |
No telemetered data are expected because of ground faults on the seafloor Multi-Function Node. Recovered data are available from instruments recording internally. Id: 355 By: leila |
CP04OSSM-MFD35 Method: telemetered |
2/9/18, 1:00 PM | 3/29/18, 8:42 AM |
Deployment 7: Communication with the MFN instruments was disabled due to intermittent communications over the DSL line.
Id: 937
By: leila
|
CP04OSSM-MFD35 Method: telemetered |
5/9/18, 11:00 PM | 10/30/18, 10:30 AM |
Instruments are presently disabled. Note: Instruments may continue to sample using internal batteries and storage cards. Id: 1517 By: leila |
CP04OSSM Method: telemetered |
1/30/19, 10:00 AM | 4/8/19, 7:39 AM |
CP04OSSM D00009 buoy broke free and went adrift on 1/30/2019, 1500UTC. All instruments on the MFN ceased telemetry on 1/30/2019 and instruments on the buoy/NSIF continued to sample through 2/1/2019. No more telemetered data expected for this deployment. Id: 1557 By: cdobson |
CP04OSSM-MFD35 |
5/11/19, 8:00 PM |
Deployment 10: Telemetered data from all MFN instruments could be delayed up to 3 days due to a limitation in communications with the MFN. Id: 1628 By: cdobson |
|
CP04OSSM-MFD35 |
11/14/19, 7:00 PM |
Deployment 11: MFN offline due to high voltage short on 2019-11-15. No telemetered data expected from instruments on the MFN; instruments with external batteries will continue to log internally.
Id: 1821
By: cdobson
|
No notes yet.