Method | Data Stream | Content | Type | |
---|---|---|---|---|
recovered_host | sio_eng_control_status_recovered | Control Status Data | Report M2M | Engineering |
telemetered | sio_eng_control_status | Status Data | Report M2M | Engineering |
Deployment | Cruise | Start Date | Stop Date | Mooring Asset | Node Asset | Sensor Asset | Latitude | Longitude | Deployment Depth | Water Depth |
---|---|---|---|---|---|---|---|---|---|---|
1 Review | KN-221-4 | 09/12/2014 | 08/18/2015 | CGMGI-03FLMA-00001 | CGCON-SIOCON-32809 | 59.7668 | -39.8425 | 26 | 2700 | |
2 Review | AT-30-01 | 08/18/2015 | 07/17/2016 | CGMGI-03FLMA-00002 | CGCON-SIOCON-12372 | 59.7707 | -39.8801 | 26 | 2689 | |
3 Review | AR-07-01 | 07/12/2016 | 08/12/2017 | CGMGI-03FLMA-00003 | CGCON-SIOCON-13278 | 59.8177 | -39.8412 | 30 | 2696 | |
4 Review | AR21 | 08/08/2017 | 06/15/2018 | CGMGI-03FLMA-00004 | CGCON-SIOCON-12368 | 59.7699 | -39.886 | 30 | 2689 | |
5 Review | AR30-03 | 06/10/2018 | 08/11/2019 | CGMGI-03FLMA-00005 | CGCON-SIOCON-14877 | 59.7681 | -39.8425 | 30 | 2700 | |
6 Review | AR35-05 | 08/07/2019 | CGMGI-03FLMA-00006 | CGCON-SIOCON-13992 | 59.7701 | -39.8842 | 30 | 2692 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GI03FLMA-RIS01 |
Annotation ID 1427 needs to be updated. By Lori Garzio, on 3/13/19 |
||
GI03FLMA-RIS01-00-SIOENG000 Deployment: 3 |
8/29/16, 12:00 AM | 8/29/16, 12:00 AM |
Controller stopped telemetering on 8/29/2016. Issue is under investigation.
By Lori Garzio,
on 10/20/16
|
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GI03FLMA |
9/12/14, 4:11 PM | 8/18/15, 6:41 AM |
Deployment 1: Mooring was deployed 10-15m shallower than planned. Id: 683 By: lgarzio |
GI03FLMA |
8/18/15, 7:48 PM | 7/16/16, 8:00 PM |
Deployment 2: Mooring was deployed 5-10m deeper than planned. Id: 684 By: lgarzio |
GI03FLMA-RIS01 |
1/21/16, 7:00 PM | 3/28/16, 8:00 PM |
Deployment 2: Secondary controller failed - no recovered_host or telemetered data expected. Id: 689 By: lgarzio |
GI03FLMA-RIS01 |
4/27/16, 8:00 PM | 7/16/16, 8:00 PM |
Deployment 2: Secondary controller failed - no leak was detected, but the battery for the controller board was drained at recovery. No recovered_host or telemetered data expected. Id: 690 By: lgarzio |
GI03FLMA-RIS01 |
8/30/16, 2:00 AM | 8/12/17, 7:36 AM |
Deployment 3: Secondary controller failed - no recovered_host or telemetered data expected. Id: 694 By: lgarzio |
GI03FLMA |
8/8/17, 11:59 AM | 6/15/18, 3:59 AM |
Deployment 4: Mooring was deployed 5-10m deeper than planned. Id: 1450 By: lgarzio |
GI03FLMA-RIS01 Method: telemetered |
6/10/18, 9:59 AM | 8/11/19, 4:25 PM |
Deployment 5: The secondary controller did not establish communications at deployment; there will be no telemetered data from the instruments connected to this controller. The instruments should be logging internally and data should be available at recovery. Id: 1427 By: cdobson |