Mobile Asset Controller

Reference Designator
GP05MOAS-GL276-00-ENG000000
Start Depth
0
End Depth
1,000
Location
Current Status
Engineering
Class
ENG00 (Mobile Asset Controller)
Series
ENG00-0
Science Discipline
Make
Teledyne Webb
Model
G2 Slocum Gliders
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/GP05MOAS/GL276/00-ENG000000/metadata
Method Data Stream Content Type
recovered_host glider_eng_metadata_recovered Metadata Report M2M Engineering
recovered_host glider_eng_recovered Engineering Data Report M2M Engineering
recovered_host glider_eng_sci_recovered Status Data Report M2M Engineering
recovered_host glider_gps_position GPS Position Data Report M2M Engineering
telemetered glider_eng_metadata Metadata Report M2M Engineering
telemetered glider_eng_sci_telemetered Status Data Report M2M Engineering
telemetered glider_eng_telemetered Engineering Data Report M2M Engineering
telemetered glider_gps_position GPS Position Data Report M2M Engineering
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
1 Review MV-1404 06/15/2014 06/02/2015 CGVGP-05MOAS-00000 CGVEH-GLDROO-00276 CGCON-GLDROO-00276 49.9965 -144.255 1000 1000
2 Review SR1811 07/23/2018 02/12/2019 CGVGP-05MOAS-00000 CGVEH-GLDROO-00276 CGCON-GLDROO-00276 50.1295 -144.542 1000 1000
Metadata Start Date End Date Comment
GP05MOAS

Glider optodes typically exhibit a sensor lag of 20-25 seconds. Example attached of several segments with consecutive down and up casts for CP05MOAS-GL335-04-DOSTAM000 on 10/26/2015 showing a typical measurement time lag. Profiles should be analyzed for individual time lags and data should be adjusted. OOI doesn't necessarily need to make the adjustment but users should be aware of the issue.

By Lori Garzio, on 5/31/19

GP05MOAS-GL276
Deployment: 1

I downloaded data for this glider for automated analysis on March 3, 2020. There are a substantial amount of gaps in the CTD, DOSTA, and FLORD data that were not there when I had previously downloaded the data on Apr 12, 2019. There are now 103 days of missing CTD data, 91 days of missing DOSTA data, and 59 days of missing FLORD data that were available on Apr 12, 2019. See Redmine ticket 14654 for details.

By Lori Garzio, on 3/13/20

New Note

Metadata Start Date End Date Comment
GP05MOAS-GL276
6/15/14, 1:30 AM 6/1/15, 8:00 PM

Deployment 1: Deployed on 6/15/2014, recovered on 6/18/2014 for ballast correction and re-deployed at 07:36 UTC.

Id: 590 By: lgarzio

GP05MOAS-GL276
1/27/19, 8:00 AM 2/12/19, 5:00 PM

Glider 276 was suspected to be showing early signs of battery failure so it was set adrift on 1/27/19 and successfully recovered on 2/12/19. No science data is expected after 1/27/19.

Id: 1561 By: cdobson