Method | Data Stream | Content | Type | |
---|---|---|---|---|
recovered_host | flort_sample | Data Products | Report M2M Stats | Science |
telemetered | flort_sample | Data Products | Report M2M Stats | Science |
Deployment | Cruise | Start Date | Stop Date | Mooring Asset | Node Asset | Sensor Asset | Latitude | Longitude | Deployment Depth | Water Depth |
---|---|---|---|---|---|---|---|---|---|---|
1 Review | AT-26-29 | 02/23/2015 | 12/19/2015 | CGMGS-03FLMB-00001 | CGINS-FLORTD-01217 | -54.0803 | -88.9346 | 27 | 4932 | |
2 Review | NBP-15-11 | 12/16/2015 | 12/05/2016 | CGMGS-03FLMB-00002 | CGINS-FLORTD-01322 | -54.0824 | -88.859 | 29 | 4942 | |
3 Review | NBP16-10 | 12/03/2016 | 12/03/2017 | CGMGS-03FLMB-00003 | CGINS-FLORTD-01214 | -54.0803 | -88.9318 | 30 | 4928 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS03FLMB-RIS01-05-FLORTD000 |
pressure_depth (dbar) is an array of all fill values for every deployment. This variable should contain valid pressure data. By Lori Garzio, on 7/11/19 |
||
GS03FLMB-RIS01-05-FLORTD000 Deployment: 1 |
seawater_scattering_coefficient and optical_backscatter are all fill values for this deployment. By Lori Garzio, on 7/11/19 |
||
GS03FLMB Deployment: 3 |
Annotation ID 379 needs to be updated - according to asset management, the bottom portion of the mooring was recovered on 2018-12-10T17:57:00. By Lori Garzio, on 1/15/19 |
||
GS03FLMB-RIS01-05-FLORTD000 Deployment: 3 |
95% of seawater_scattering_coefficient and optical_backscatter data are fill values for this deployment. By Lori Garzio, on 7/11/19 |
||
GS03FLMB-RIS01-05-FLORTD000 Deployment: 3 |
Missing data for deployment 3 should be annotated. By Lori Garzio, on 7/11/19 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS03FLMB |
2/23/15, 3:19 PM | 12/19/15, 1:40 PM |
Deployment 1: Mooring was deployed 5-10m shallower than planned. Id: 720 By: lgarzio |
GS03FLMB-RIS01 |
8/16/15, 2:45 PM | 12/19/15, 1:40 PM |
Deployment 1: Controller failed on 8/16/2015. No recovered_host DOSTA and FLORT data expected for the remainder of the deployment. (The controller attempted to re-enter its scheduled operation on 10/23, however the battery voltage was too low and logging failed again on 10/26) Id: 753 By: lgarzio |
GS03FLMB-RIS01 |
3/27/16, 8:00 PM | 12/5/16, 6:45 AM |
Deployment 2: Controller failed on 3/28/2016 due to a depleted battery. No recovered_host DOSTA and FLORT data expected for the remainder of the deployment. (The controller attempted to re-enter its scheduled operation on 6/5, however logging failed again on 6/11 when the remaining battery power was depleted.) Id: 761 By: lgarzio |
GS03FLMB |
12/3/16, 2:08 PM | 12/3/17, 7:32 AM |
Deployment 3: Data were not transmitted via satellite telemetry. Due to adverse weather conditions, the bottom portion of the mooring has not yet been recovered (sensors: GS03FLMB-RIM01-02-CTDMOG068, GS03FLMB-RIM01-02-CTDMOH069, GS03FLMB-RIM01-02-CTDMOH070, GS03FLMB-RIM01-02-CTDMOH071). Recovery options pending. Id: 379 By: lgarzio |