Method | Data Stream | Content | Type | |
---|---|---|---|---|
streamed | velpt_battery_voltage | Battery Voltage Data | Report M2M | Engineering |
streamed | velpt_clock_data | Clock Data | Report M2M | Engineering |
streamed | velpt_hardware_configuration | Configuration Data | Report M2M | Engineering |
streamed | velpt_head_configuration | Configuration Data | Report M2M | Engineering |
streamed | velpt_identification_string | Identification String Data | Report M2M | Engineering |
streamed | velpt_user_configuration | Configuration Data | Report M2M | Engineering |
streamed | velpt_velocity_data | Data Products | Report M2M Stats | Science |
Deployment | Cruise | Start Date | Stop Date | Mooring Asset | Node Asset | Sensor Asset | Latitude | Longitude | Deployment Depth | Water Depth |
---|---|---|---|---|---|---|---|---|---|---|
1 Review | TN-313 | 09/29/2014 | 07/06/2015 | ATAPL-68870-001-0140 | ATAPL-70114-00003 | 44.529 | -125.389 | 2906 | ||
2 Review | TN-326 | 07/07/2015 | 07/17/2016 | ATAPL-68870-001-0143 | ATAPL-70114-00006 | 44.529 | -125.39 | 2906 | ||
3 Review | SKQ201610S | 07/18/2016 | 07/28/2017 | ATAPL-68870-001-0140 | ATAPL-70114-00003 | 44.529 | -125.39 | 2906 | ||
4 Review | RR1713 | 08/04/2017 | 06/24/2018 | ATAPL-68870-001-0143 | ATAPL-70114-00006 | 44.529 | -125.39 | 2906 | ||
5 Review | RR1809 | 06/24/2018 | 07/09/2018 | ATAPL-68870-001-0140 | ATAPL-70114-00002 | 44.529 | -125.39 | 2906 | ||
6 Review | RR1810 | 07/09/2018 | 06/14/2019 | ATAPL-68870-001-0142 | ATAPL-70114-00004 | 44.529 | -125.39 | 2906 | ||
7 Review | AT-42-12 | 06/14/2019 | ATAPL-68870-001-0143 | ATAPL-70114-00006 | 44.529 | -125.39 | 0 | 2906 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
RS01SBPS-SF01A |
There are no deployment depths in asset management for any of the instruments on the shallow profiler. By Lori Garzio, on 11/21/19 |
||
RS01SBPS-SF01A |
Annotation ID 1287 should be updated - it says an investigation is currently in process and the date of the annotation is 2017. By Lori Garzio, on 11/21/19 |
||
RS01SBPS-SF01A-4B-VELPTD102 Deployment: 1 |
52% of velpt_d_upward_velocity values are outside of global ranges for this deployment. By Lori Garzio, on 11/22/19 |
||
RS01SBPS-SF01A Deployment: 1 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
RS01SBPS-SF01A-4B-VELPTD102 |
10/6/14, 7:32 PM |
According to the manufacturer, data are suspect when the instrument is tilted more than 20 degrees (measured by pitch and roll). Id: 832 By: lgarzio |
|
RS01SBPS |
12/7/14, 2:45 PM | 12/15/14, 7:00 PM |
Note: PFE down. HVPS1 MOV explosion, 800A breaker tripped, investigation and restoration Id: 1248 By: knuth |
RS01SBPS |
1/7/15, 2:32 AM | 1/7/15, 3:06 AM |
Note: PNWGP Portland <-> Seattle outage. Possible data gap < 24h. Id: 1250 By: knuth |
RS01SBPS |
1/30/15, 7:00 PM | 2/3/15, 7:00 PM |
Note: Intermittent partial data loss due to storage drive problems at OTB Id: 1251 By: knuth |
RS01SBPS |
3/21/15, 10:10 AM | 3/22/15, 12:20 AM |
Note: PNWGP outage due to City of Seattle fiber cable work. Possible data gap < 24h. Id: 1256 By: knuth |
RS01SBPS |
6/12/15, 8:00 PM | 6/15/15, 12:30 PM |
Note: Network issues due to fire that damaged fibers between Portland and Seattle Id: 1259 By: knuth |
RS01SBPS |
8/28/15, 8:00 PM | 8/28/15, 8:30 PM |
Note: Outage during major utility power failure in Seattle. Possible data gap < 24h. Id: 1262 By: knuth |
RS01SBPS |
1/7/16, 1:10 AM | 1/7/16, 1:52 AM |
Note: Four 1-minute outages between Portland and Seattle due to maintenance. Possible data gap < 24h. Id: 1266 By: knuth |
RS01SBPS |
3/10/16, 6:06 PM | 3/11/16, 4:30 AM |
Note: Fiber break between Portland and Seattle. Possible data gap < 24h. Id: 1268 By: knuth |
RS01SBPS |
5/20/16, 12:33 PM | 5/20/16, 2:04 PM |
Note: Fiber break between Portland and Pacific City. Possible data gap < 24h. Id: 1274 By: knuth |
RS01SBPS |
7/11/16, 10:53 PM | 7/11/16, 11:51 PM |
Note: Unexplained loss of power at Pittock Building in Portland. Possible data gap < 24h. Id: 1276 By: knuth |
RS01SBPS |
12/17/16, 1:00 PM | 12/17/16, 2:00 PM |
Note: Corvalis data center lost power. Possible data gap < 24h. Id: 1281 By: knuth |
RS01SBPS |
12/21/16, 8:50 PM | 12/23/16, 7:44 AM |
Note: Fiber break in Portland due to train crash. Possible data gap < 24h. Id: 1282 By: knuth |
RS01SBPS |
1/8/17, 2:58 PM | 1/8/17, 4:41 PM |
Note: Network outage during major Seattle utility power failure. Possible data gap < 24h. Id: 1283 By: knuth |
RS01SBPS |
1/9/17, 1:32 PM | 1/9/17, 4:30 PM |
Note: Lightning strike in Pacific City led to data interruption through isolation of both cable lines from shore station equipment. Possible data gap < 24h. Id: 1286 By: knuth |
RS01SBPS-SF01A |
1/28/17, 7:00 PM | 8/3/17, 8:00 PM |
Note: On Sunday, January 29th, the Shallow Profiler at Slope Base (SC01A) stopped during the profiler down cast - approximately 80m of cable out (120m below the surface). Initial analysis of the engineering data indicates the profiler encountered a high electrical current event, and level wind/winch speed mismatch (similar to SC03A). The power to the port was turned off on 1/29 pending additional analysis. Additional analysis of the engineering, science and environmental data is in process. The Science Pod is not currently powered and science/engineering data is not being collected. Id: 1287 By: knuth |
RS01SBPS |
2/7/17, 8:00 AM | 2/7/17, 10:00 AM |
Note: Outage during PNWGP 1-hour router-maintenance. Possible data gap < 24h. Id: 1288 By: knuth |
RS01SBPS |
2/15/17, 9:43 AM | 2/15/17, 12:16 PM |
Note: On Wednesday, February 15, power to the North and South cable lines of the Cabled Array was interrupted and all deployed infrastructure went offline. Power was restored on February 16. No hardware issue subsea was identified. Possible data gap < 24h. Id: 1289 By: knuth |
RS01SBPS |
1/18/18, 10:00 PM | 1/19/18, 2:00 PM |
A brief violent storm caused loss of power to both the North and South cable lines and the deployed infrastructure during this time. For more information please contact help@oceanobservatories.org. (Redmine # 13109)
Id: 319
By: friedrich.knuth
|
RS01SBPS-SF01A |
3/20/18, 8:13 PM | 6/24/18, 6:40 AM |
SF01A powered down on 3/21/2018 due to oil leak. (Redmine #13323). Instruments on profiler turned on 2018-06-24.
Id: 1369
By: friedrich.knuth
|
RS01SBPS |
8/22/18, 1:00 PM | 8/24/18, 4:00 PM |
On Wednesday Aug 22 2018, an automatic protective shutdown of primary power to the OOI Cabled Array occurred during installation of a new chiller system. Power was restored on Aug 24. Due to loss of power to the Cabled Array marine infrastructure, data were not collected by the instruments.
Id: 1486
By: lgarzio
|