No deployments found
No notes yet.
Metadata | Start Date | End Date | Comment |
---|---|---|---|
CP03ISSM-SBD11 Method: telemetered |
6/18/18, 2:05 AM | 10/28/18, 11:43 PM |
Instruments were temporarily disabled due to power constraints. The instruments could be revived to send data via telemetry when sufficient power is available. Note: Instruments may continue to collect data on internal battery power.
Id: 1563
By: leila
|
CP03ISSM |
1/7/20, 7:00 PM |
Deployment 11: UPDATED 2020-04-27: As of 2020-03-12 telemetered data for most instruments are being sent home via Iridium. A gap in telemetered data is expected between 2020-01-08 and 2020-03-12 and will not be backfilled but these data will be available upon recovery.* As of 2020-01-08 both fleet broadband telemetry pathways have failed and data can no longer be telemetered to shore from this mooring. Instruments will continue to log data which will be available upon recovery.
Id: 1889
By: cdobson
|