Metadata | Start Date | End Date | Comment |
---|---|---|---|
GI03FLMB |
9/16/14, 9:24 AM | 8/20/15, 8:56 AM |
Deployment 1: Mooring was deployed 5-10m shallower than planned. Id: 1451 By: lgarzio |
GI03FLMB-RIS01 |
8/21/15, 1:11 PM | 7/17/16, 8:00 PM |
Deployment 2: Low battery warnings from the mooring controller were sent via satellite telemetry starting in early Nov 2015, controller failed. Id: 561 By: lgarzio |
GI03FLMB |
8/21/15, 1:11 PM | 7/17/16, 8:00 PM |
Deployment 2: Mooring was deployed 5m deeper than planned. Id: 1452 By: lgarzio |
GI03FLMB-RIS01 |
8/21/15, 1:11 PM | 7/17/16, 8:00 PM |
Deployment 2: Secondary controller failed - no leak was detected, but the battery appears to have drained a few days after the deployment. No recovered_host or telemetered data expected. Id: 691 By: lgarzio |
GI03FLMB-RIS01 |
10/9/16, 6:00 PM | 12/17/16, 8:00 PM |
Deployment 3: Secondary controller failed - no recovered_host or telemetered data expected. Id: 695 By: lgarzio |
GI03FLMB-RIS01 |
1/12/17, 1:15 PM | 8/11/17, 8:02 AM |
Deployment 3: Secondary controller failed - no leak was detected, but the battery for the controller board was drained at recovery. No recovered_host or telemetered data expected. Id: 696 By: lgarzio |
GI03FLMB |
8/7/17, 11:49 AM | 6/11/18, 3:36 PM |
Deployment 4: Mooring was deployed 10-15m deeper than planned. Id: 1453 By: lgarzio |