Mooring Riser

Reference Designator
GI03FLMB-RIS01

No deployments found

No notes yet.

New Note

Metadata Start Date End Date Comment
GI03FLMB
9/16/14, 9:24 AM 8/20/15, 8:56 AM

Deployment 1: Mooring was deployed 5-10m shallower than planned.

Id: 1451 By: lgarzio

GI03FLMB-RIS01
8/21/15, 1:11 PM 7/17/16, 8:00 PM

Deployment 2: Low battery warnings from the mooring controller were sent via satellite telemetry starting in early Nov 2015, controller failed.

Id: 561 By: lgarzio

GI03FLMB
8/21/15, 1:11 PM 7/17/16, 8:00 PM

Deployment 2: Mooring was deployed 5m deeper than planned.

Id: 1452 By: lgarzio

GI03FLMB-RIS01
8/21/15, 1:11 PM 7/17/16, 8:00 PM

Deployment 2: Secondary controller failed - no leak was detected, but the battery appears to have drained a few days after the deployment. No recovered_host or telemetered data expected.

Id: 691 By: lgarzio

GI03FLMB-RIS01
10/9/16, 6:00 PM 12/17/16, 8:00 PM

Deployment 3: Secondary controller failed - no recovered_host or telemetered data expected.

Id: 695 By: lgarzio

GI03FLMB-RIS01
1/12/17, 1:15 PM 8/11/17, 8:02 AM

Deployment 3: Secondary controller failed - no leak was detected, but the battery for the controller board was drained at recovery. No recovered_host or telemetered data expected.

Id: 696 By: lgarzio

GI03FLMB
8/7/17, 11:49 AM 6/11/18, 3:36 PM

Deployment 4: Mooring was deployed 10-15m deeper than planned.

Id: 1453 By: lgarzio