Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | recovered_inst | 313 | 313 | 0 | 0 | 0 | 0 | 29,913 | 900 | 12 / 12 | 1 | Complete | |||||
2 | recovered_inst | 365 | 365 | 0 | 0 | 0 | 0 | 2,617,043 | 12 | 12 / 13 | 2 | 3 | Complete |
Deployment: | 1 | 2 |
---|---|---|
100% | 100% |
Deployment: | 1 | 2 |
---|---|---|
1 | 0.00 | |
2 | 9.79 | 0.00 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RID16-03-CTDBPF000 Method: recovered_inst |
11/24/16, 8:11 PM | 12/8/18, 11:42 PM |
Deployment 3: There is no recovered instrument data available for the CTDBP on the NSIF for this deployment as the file could not be downloaded from the instrument upon recovery.
Id: 2131
By: cdobson
|
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-RID16 |
2/3/19, 1:00 PM | 2/11/19, 7:00 AM |
Deployment 4: The NSIF experienced power failure on 2/3/19 1800UTC and power was restored on 2/11/19 1200UTC. All NSIF instruments will have this gap in their telemetered data. Id: 1577 By: cdobson |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RID16-03-CTDBPF000 |
The sampling rate changed from every 15 minutes during deployment 1 to every 12 seconds during deployment 2. The data should be annotated to explain why the sampling rate changed and/or which sampling rate is different than the designed sampling rate. It appears that the high sampling rate captured a slightly wider range in seawater pressure (see attached figure). By Lori Garzio, on 3/15/19 |
||
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |