Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | recovered_inst | 313 | 313 | 0 | 0 | 0 | 0 | 50,393 | 1 | 12 / | 1 | 2 | 3 | Complete | |||
2 | recovered_inst | 365 | 365 | 0 | 0 | 0 | 0 | 87,032 | 1 | 12 / | 4 | 2 | 3 | Complete |
Deployment: | 1 | 2 |
---|---|---|
100% | 100% |
Deployment: | 1 | 2 |
---|---|---|
1 | 0.00 | |
2 | 9.79 | 0.00 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RID16-07-NUTNRB000 |
12/14/15, 3:20 PM | 12/12/16, 2:58 AM |
Deployment 2: Battery was not connected and the dummy plug was still installed at recovery. Id: 756 By: lgarzio |
GS01SUMO-RID16-07-NUTNRB000 Method: recovered_inst |
11/24/16, 8:11 PM | 12/8/18, 11:42 PM |
Deployment 3: There is no recovered instrument data available for the NUTNR on the NSIF for this deployment as the instrument would not communicate upon recovery.
Id: 2130
By: cdobson
|
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-RID16-07-NUTNRB000 |
8/12/18, 8:00 PM | 12/8/18, 11:42 PM |
Deployment 3: This instrument is known to have stopped sampling on 2018-08-13. No telemetered or recovered_host data expected after this date.
Id: 2133
By: cdobson
|
GS01SUMO-RID16-07-NUTNRB000 |
12/4/18, 12:10 PM |
The Satlantic ISUS instrument has been discontinued, and all OOI ISUS units have been converted to the Sea-Bird SUNA model as of the start date/time of this annotation. Id: 1568 By: swhite |
|
GS01SUMO-RID16 |
2/3/19, 1:00 PM | 2/11/19, 7:00 AM |
Deployment 4: The NSIF experienced power failure on 2/3/19 1800UTC and power was restored on 2/11/19 1200UTC. All NSIF instruments will have this gap in their telemetered data. Id: 1577 By: cdobson |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RID16-07-NUTNRB000 |
There is no pressure variable in the .nc files. This should be a coordinate. By Lori Garzio, on 7/23/19 |
||
GS01SUMO-RID16-07-NUTNRB000 Deployment: 1 |
|||
GS01SUMO-RID16-07-NUTNRB000 Deployment: 2 |
|||
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |