Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2 | recovered_inst | 365 | 65 | 0 | 299 | 0 | 0 | 1,536 | 3,600 | 80 / 80 | Complete |
All good!
Deployment: | 2 |
---|---|
18% |
Deployment: | 2 |
---|---|
2 | 0.00 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-CTDBPP032 |
2/16/16, 3:00 PM | 2/16/16, 3:00 PM |
Deployment 2: Instrument failed.
Id: 143
By: lgarzio
|
GS01SUMO-RII11-02-CTDBPP032 |
5/15/17, 8:00 PM | 12/8/18, 11:42 PM |
Deployment 3: The CTDBP02 is known to have ceased sampling on 2017-05-16 and no telemetered or recovered data are expected after this date. Root cause unknown.
Id: 2135
By: cdobson
|
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-RII11-02-CTDBPP032 |
12/4/18, 12:10 PM | 1/20/20, 5:01 AM |
Deployment 4: Some recovered data to 2/22/2019; the pump was missing on recovery. Internal clock batteries became detached during deployment resulting in invalid timestamps. Id: 2208 By: swhite |
GS01SUMO-RII11-02-CTDBPP032 |
2/2/19, 7:00 PM | 1/20/20, 5:01 AM |
UPDATED 2020-04-15: Some recovered data to 2/22/2019; the pump was missing on recovery. * Deployment 4: Data telemetry ceased 2/3/2019. Root cause still to be determined. Id: 1602 By: cdobson |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-CTDBPP032 Deployment: 2 |
2/16/16, 8:00 PM | 12/12/16, 7:58 AM |
Annotation ID 143 should be updated to 1) include the entire time range for which there are no data (2016-02-16T20:00 - 2016-12-12T07:58) and 2) include more details about why the instrument failed (if known). By Lori Garzio, on 3/18/19 |
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |