Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2 | recovered_inst | 365 | 145 | 0 | 219 | 0 | 0 | 3,448 | 3,600 | 130 / 129 | 1 | Complete |
Deployment: | 2 |
---|---|
40% |
Deployment: | 2 |
---|---|
2 | 0.00 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-CTDBPP033 |
12/14/15, 3:20 PM | 5/6/16, 8:00 AM |
Deployment 2: Recovered-instrument and telemetered values are offset for pressure, temperature, salinity, and density. The issue is unclear at this time.
Id: 412
By: lgarzio
|
GS01SUMO-RII11-02-CTDBPP033 |
5/6/16, 8:00 AM | 12/12/16, 2:58 AM |
Deployment 2: Instrument failed.
Id: 144
By: lgarzio
|
GS01SUMO-RII11-02-CTDBPP033 |
7/9/17, 8:00 PM | 12/8/18, 11:42 PM |
Deployment 3: The CTDBP03 is known to have stopped sampling on 2017-07-11 and no telemetered or recovered data are expected after this date. Root cause unknown.
Id: 2136
By: cdobson
|
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-RII11-02-CTDBPP033 |
1/14/19, 7:00 PM | 1/20/20, 5:01 AM |
UPDATED 2020-04-15: The instrument was not recovered; no telemetered or recovered data. * Deployment 4: Data telemetry ceased 1/15/2019. Root cause still to be determined. Id: 1603 By: cdobson |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-CTDBPP033 |
Annotation ID 144 should be updated to include more information regarding the instrument failure (if known). By Lori Garzio, on 3/18/19 |
||
GS01SUMO-RII11-02-CTDBPP033 Deployment: 2 |
12/14/15, 9:00 PM | 5/6/16, 12:00 PM |
Annotation ID 412 notes that there is a difference between delivery methods. Recovered_inst pressure values are 4.8 - 5.7 dbar lower than the same values in the recovered_host and telemetered data streams. Salinity and density are also offset. This issue needs to be investigated. By Lori Garzio, on 3/18/19 |
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |