Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | recovered_inst | 313 | 313 | 0 | 0 | 0 | 0 | 59,826 | 450 | 180 / 180 | Complete | ||||||
2 | recovered_inst | 365 | 365 | 0 | 0 | 0 | 0 | 69,788 | 450 | 180 / 181 | Complete |
All good!
Deployment: | 1 | 2 |
---|---|---|
100% | 100% |
Deployment: | 1 | 2 |
---|---|---|
1 | 0.00 | |
2 | 9.79 | 0.00 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-RII11-02-CTDMOQ014 |
3/25/18, 8:00 PM | 12/8/18, 11:42 PM |
Deployment 3: The CTDMOQ014 is known to have stopped sampling on 2018-03-26 and no data are expected after this date. A data gap is known to exist between 2017-10-27 and 2017-12-11 for telemetered and recovered_host data.
Id: 2140
By: cdobson
|
GS01SUMO-RII11-02-CTDMOQ014 |
12/4/18, 12:10 PM | 1/20/20, 5:01 AM |
Deployment 4: On recovery the conductivity cell guard and anti-foulant plugs were missing; the conductivity cell and temperature probe appeared to be intact. Id: 2212 By: swhite |
GS01SUMO-RII11-02-CTDMOQ014 |
1/15/19, 7:00 PM | 1/20/20, 5:01 AM |
UPDATED 2020-06-23: On recovery the conductivity cell guard and anti-foulant plugs were missing; the conductivity cell and temperature probe appeared to be intact. * Deployment 4: Frequent bad characters, invalid timestamps or unrealistic data present from 2019-01-16 onward. Id: 1610 By: cdobson |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-CTDMOQ014 Deployment: 2 |
11/8/16, 12:00 AM | 12/12/16, 7:58 AM |
Conductivity, density and salinity drop off at the end of the deployment. This should be investigated and annotated in uFrame. Excluding from final statistics. By Lori Garzio, on 2/5/19 |
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |