Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | recovered_inst | 313 | 313 | 0 | 0 | 0 | 0 | 59,826 | 450 | 130 / 130 | Complete |
All good!
Deployment: | 1 |
---|---|
100% |
Deployment: | 1 |
---|---|
1 | 0.00 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-CTDMOQ033 Deployment: 1 |
Suggestion: add an annotation to explain why this reference designator only has 1 deployment. By Lori Garzio, on 1/31/19 |
||
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |