Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | recovered_inst | 313 | 313 | 0 | 0 | 0 | 0 | 59,826 | 450 | 1500 / 1490 | Complete | ||||||
2 | recovered_inst | 365 | 365 | 0 | 0 | 0 | 0 | 69,787 | 450 | 1500 / 1494 | Complete |
All good!
Deployment: | 1 | 2 |
---|---|---|
100% | 100% |
Deployment: | 1 | 2 |
---|---|---|
1 | 0.00 | |
2 | 9.79 | 0.00 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-CTDMOR020 |
2/18/15, 4:06 PM | 12/27/15, 6:20 AM |
Deployment 1: High conductivity bias starting in the middle of the deployment (around July 2015). Id: 749 By: lgarzio |
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-RII11-02-CTDMOR020 |
1/30/18, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: The CTDMOQ020 is known to have stopped sampling on 2018-01-31 and no data are expected after this date. A data gap is known to exist between 2017-10-27 and 2017-12-11 for telemetered and recovered_host data.
Id: 2146
By: cdobson
|
GS01SUMO-RII11-02-CTDMOR020 Method: telemetered |
2/21/19, 7:00 PM | 1/20/20, 5:01 AM |
Deployment 4: Frequent bad characters; invalid timestamps or unrealistic data present from 2019-02-23 onward. Id: 1604 By: cdobson |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-CTDMOR020 Deployment: 1 |
2/18/15, 9:06 PM | 12/27/15, 11:20 AM |
Annotation ID 749: "High conductivity bias starting in the middle of the deployment (around July 2015)." This should be investigated and the annotation should be updated. Excluding entire deployment from final statistics. By Lori Garzio, on 2/5/19 |
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |