Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2 | recovered_host | / | Blocked |
All good!
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-DOSTAD031 |
12/14/15, 3:20 PM | 2/14/19, 7:00 PM |
UPDATED 2020-06-19: The data calculation issue was resolved on 15 Feb 2019. * Dissolved Oxygen concentrations are currently not being calculated due to a function error. Issue under investigation (Redmine 13228). Id: 789 By: lgarzio |
GS01SUMO-RII11-02-DOSTAD031 |
1/27/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: The DOSTAD031 is known to have failed on 2017-01-28. No data are expected after this date. Root cause unknown.
Id: 2154
By: cdobson
|
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-RII11-02-DOSTAD031 |
12/5/18, 11:19 AM | 1/20/20, 5:01 AM |
Deployment 4: Data telemetery ceased 12/5/2018. The instrument was not recovered; no telemetered or recovered data. Id: 2043 By: swhite |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-DOSTAD031 Deployment: 2 |
There are no recovered_host or telemetered data available for download from this instrument for deployment 2. There should be an annotation in the system indicating why there are no data available. By Lori Garzio, on 1/15/19 |
||
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |