Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2 | recovered_host | 365 | 142 | 0 | 223 | 0 | 0 | 3,224 | 3,600 | 130 / | 1 | 2 | Complete |
Deployment: | 2 |
---|---|
39% |
Deployment: | 2 |
---|---|
2 | 0.00 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-FLORDG033 |
7/10/17, 8:00 PM | 12/8/18, 11:42 PM |
Deployment 3: The FLORDG033 is known to have ceased sampling on 2017-07-11. No data are expected after this date. Root cause unknown.
Id: 2153
By: cdobson
|
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-RII11-02-FLORDG033 |
12/4/18, 12:10 PM | 1/20/20, 5:01 AM |
Deployment 4: The CTD to which this instrument was connected was lost. Telemetered data ceased on 1/15/2019; no recovered data. The bulkhead connector was damaged and the shutter was stopped partially obscuring the lens. Id: 2217 By: swhite |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-FLORDG033 |
There is no pressure variable in the netCDF files. This should be a coordinate. By Lori Garzio, on 3/22/19 |
||
GS01SUMO-RII11-02-FLORDG033 Deployment: 2 |
5/3/16, 4:00 AM | 12/12/16, 7:58 AM |
The missing data should be annotated (the CTD this instrument was attached to failed). By Lori Garzio, on 3/22/19 |
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |