Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | recovered_host | 313 | 28 | 0 | 3 | 24 | 281 | 226,204 | 2 | 1 / | 1 | Complete | |||||
2 | recovered_host | 365 | 341 | 0 | 15 | 3 | 11 | 2,649,677 | 2 | 1 / | 2 | Complete |
Deployment: | 1 | 2 |
---|---|---|
9% | 93% |
Deployment: | 1 | 2 |
---|---|---|
1 | 0.00 | |
2 | 9.79 | 0.00 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-SBD11 |
12/13/15, 7:00 PM | 12/11/16, 7:00 PM |
Upon recovery of deployment 2, damage to some components of the surface buoy were noted (e.g., FDCHP was bent, the tops of the METBK-PRC and FleetBroadBand antenna were missing). Id: 94 By: lgarzio |
GS01SUMO-SBD11-04-DOSTAD000 |
3/11/16, 7:00 PM | 12/12/16, 2:58 AM |
Deployment 2: Dissolved oxygen noise increased, possibly from biofouling.
Id: 780
By: lgarzio
|
GS01SUMO-SBD11-04-DOSTAD000 |
1/27/17, 7:00 PM |
Deployment 3: Dissolved oxygen noise increased, possibly from biofouling.
Id: 781
By: lgarzio
|
|
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-SBD11 |
11/30/19, 7:00 PM | 12/2/19, 7:00 AM |
Deployment 4: Data gap for part of the day on 12/1/2019 through 12/2/2019. Data will be available for instruments that collect internally. Id: 1828 By: cdobson |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-SBD11-04-DOSTAD000 Deployment: 1 |
|||
GS01SUMO-SBD11-04-DOSTAD000 Deployment: 1 |
There are a total of 94 days where telemetered data are available and recovered_host data are not available. The data should be available in the recovered_host data stream. See the following link for a complete list of recovered_host data gaps: https://github.com/ooi-data-lab/data-review-tools/blob/master/data_review/output/GS01SUMO/GS01SUMO-SBD11-04-DOSTAD000/GS01SUMO-SBD11-04-DOSTAD000_sciencevar_comparison_summary.csv By Lori Garzio, on 3/19/19 |
||
GS01SUMO-SBD11-04-DOSTAD000 Deployment: 2 |
dissolved_oxygen (umol kg-1) and dosta_abcdjm_cspp_tc_oxygen (umol L-1) values are unreasonable (close to zero). Data should be annotated and issue should be investigated. By Lori Garzio, on 3/19/19 |
||
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |