Data Concentrator Logger (DCL)

Reference Designator
CE02SHSM-RID26-00-DCLENG000
Start Depth
7
End Depth
7
Location
Current Status
Engineering
Class
DCLEN (Data Concentrator Logger (DCL))
Series
DCLEN-G
Science Discipline
Make
WHOI
Model
Data Concentrator Logger
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/CE02SHSM/RID26/00-DCLENG000/metadata
Method Data Stream Content Type
recovered_host cg_dcl_eng_dcl_cpu_uptime_recovered CPU Uptime Data Report M2M Engineering
recovered_host cg_dcl_eng_dcl_dlog_aarm_recovered Accelerometer Data Report M2M Engineering
recovered_host cg_dcl_eng_dcl_dlog_mgr_recovered Data Log Manager Report M2M Engineering
recovered_host cg_dcl_eng_dcl_dlog_status_recovered Data Logger Status Report M2M Engineering
recovered_host cg_dcl_eng_dcl_error_recovered Error Data Report M2M Engineering
recovered_host cg_dcl_eng_dcl_gps_recovered GPS Data Report M2M Engineering
recovered_host cg_dcl_eng_dcl_msg_counts_recovered Message Counts Data Report M2M Engineering
recovered_host cg_dcl_eng_dcl_pps_recovered Pulse Data Report M2M Engineering
recovered_host cg_dcl_eng_dcl_status_recovered Status Data Report M2M Engineering
recovered_host cg_dcl_eng_dcl_superv_recovered Leak Detect Data Report M2M Engineering
telemetered cg_dcl_eng_dcl_cpu_uptime CPU Uptime Data Report M2M Engineering
telemetered cg_dcl_eng_dcl_dlog_aarm Accelerometer Data Report M2M Engineering
telemetered cg_dcl_eng_dcl_dlog_mgr Data Log Manager Report M2M Engineering
telemetered cg_dcl_eng_dcl_dlog_status Data Logger Status Report M2M Engineering
telemetered cg_dcl_eng_dcl_error Error Data Report M2M Engineering
telemetered cg_dcl_eng_dcl_gps GPS Data Report M2M Engineering
telemetered cg_dcl_eng_dcl_msg_counts Message Counts Data Report M2M Engineering
telemetered cg_dcl_eng_dcl_pps Pulse Data Report M2M Engineering
telemetered cg_dcl_eng_dcl_status Status Data Report M2M Engineering
telemetered cg_dcl_eng_dcl_superv Leak Detect Data Report M2M Engineering
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
1 Review OC1503D 04/02/2015 09/22/2015 CGMCE-02SHSM-00001 CGCON-NDCL26-00016 44.6383 -124.304 7 80
2 Review OC1510A 10/07/2015 05/16/2016 CGMCE-02SHSM-00002 CGCON-NDCL26-00025 44.6354 -124.303 7 82
3 Review TN-342 05/17/2016 09/28/2016 CGMCE-02SHSM-00003 CGCON-NDCL26-00017 44.6357 -124.304 7 80
4 Review AT37-03 09/26/2016 04/22/2017 CGMCE-02SHSM-00004 CGCON-NDCL26-00029 44.6393 -124.304 7 80
5 Review SKQ201704S 04/20/2017 10/15/2017 CGMCE-02SHSM-00005 CGCON-NDCL26-00010 44.6358 -124.304 7 81
6 Review SKQ201715S 10/10/2017 04/04/2018 CGMCE-02SHSM-00006 CGCON-NDCL26-00037 44.6393 -124.304 7 80
7 Review SKQ201808S 04/03/2018 09/25/2018 CGMCE-02SHSM-00007 CGCON-NDCL26-00047 44.6357 -124.304 7 80
8 Review SR1813 09/22/2018 04/21/2019 CGMCE-02SHSM-00008 CGCON-NDCL26-00027 44.6395 -124.301 7 80
9 Review SKQ201910S 04/19/2019 10/22/2019 CGMCE-02SHSM-00009 CGCON-NDCL26-00036 44.6356 -124.304 7 80
10 Review SKQ201921S 10/20/2019 CGMCE-02SHSM-00010 CGCON-NDCL26-00027 44.6396 -124.303 7 80

No notes yet.

New Note

Metadata Start Date End Date Comment
CE02SHSM-RID26
5/8/17, 8:00 PM 5/13/17, 8:00 PM

Communications with instruments on the NSIF for CE02SHSM are offline. Monitoring current draws to the NSIF shows a pattern of increased and expected current draws every 15 minutes, corresponding to the instrument sampling schedules. This suggests that the DCLs and attached instruments are still operating, but communications to the system are offline, reason unknown. Affected systems are: CPM2, DCL26: ADCPT, VELPT, PHSEN, uCSPP (acoustic modem communications), NUTNR, SPKIR, DCL27: OPTAA, FLORT, DOSTA, CTDBP. NSIF communicated starting again early on the 14th. Logs from NSIF systems indicate that the systems and instruments are still working, pointing to a communications issue between the NSIF and the surface buoy telemetry system.

Id: 865 By: michaesm
Flag: not_available Exclude: No

CE02SHSM-RID26
Method: telemetered
11/22/19, 3:45 PM 1/7/20, 1:30 PM

Due to reduced power on the mooring (limited recharging of the batteries with light winds and sea lions blocking the solar panels), we have had to reduce the operating schedule of the 7 meter platform. Normally we run the system continuously, but have reduced that schedule to hourly.

Id: 1835 By: wingardc

CE02SHSM-RID26
Method: telemetered
1/7/20, 7:00 PM 1/13/20, 1:45 PM

Due to an intermittent communications issue with DCL26, we are not receiving data from the instruments consistently. We expect the data to be available upon mooring recovery.

Id: 1890 By: wingardc
Flag: not_available Exclude: No

CE02SHSM-RID26
Method: telemetered
1/13/20, 1:45 PM

During a large storm event on 2020-01-11, power from the wind turbines was lost. This is the primary means of recharging the battery system on the mooring. With the loss of recharging power, we have had to implement a conservative power model. These systems and instruments have been disabled for the foreseeable future, and no further data will collected from them.

Id: 1902 By: wingardc
Flag: not_operational Exclude: No