CTD

Reference Designator
CE05MOAS-GL320-05-CTDGVM000
Start Depth
0
End Depth
1,000
Location
Current Status
Review Complete
Class
CTDGV (CTD Glider)
Series
CTDGV-M
Science Discipline
Physical
Make
Sea-Bird
Model
SBE Glider Payload CTD (GP-CTD)
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/CE05MOAS/GL320/05-CTDGVM000/metadata
Method Data Stream Content Type
recovered_host ctdgv_m_glider_instrument_recovered Data Products Report M2M Stats Science
telemetered ctdgv_m_glider_instrument Data Products Report M2M Stats Science
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
1 Review OC1410A 10/07/2014 12/29/2014 CGVCE-05MOAS-00000 CGVEH-GLDRCE-00320 CGINS-CTDGVM-09024 44.3733 -124.95 1000 1000
2 Review PS1606 06/16/2016 09/27/2016 CGVCE-05MOAS-00000 CGVEH-GLDRCE-00320 CGINS-CTDGVM-09024 44.6449 -124.289 1000 1000
3 Review SKQ201704S 04/10/2017 05/22/2017 CGVCE-05MOAS-00000 CGVEH-GLDRCE-00320 CGINS-CTDGVM-09015 46.98 -124.561 1000 1000
4 Review PS201805A 05/03/2018 08/02/2018 CGVCE-05MOAS-00000 CGVEH-GLDRCE-00320 CGINS-CTDGVM-09087 44.6441 -124.181 1000 1000
5 Review SKQ201921S 10/12/2019 01/17/2020 CGVCE-05MOAS-00000 CGVEH-GLDRCE-00320 CGINS-CTDGVM-09023 46.984 -124.563 1000 1000
Metadata Start Date End Date Comment
CE05MOAS

Bad altimeter pings are apparent in many deployments of the coastal gliders. A few example plots are attached - m_water_depth plotted as semi-transparent bathymetry.

By Lori Garzio, on 5/10/19

CE05MOAS

Glider optodes typically exhibit a sensor lag of 20-25 seconds. Example attached of 3 consecutive down and up casts for CE05MOAS-GL312-04-DOSTAM000 on 7/8/2014 showing a typical measurement time lag. Profiles should be analyzed for individual time lags and data should be adjusted. OOI doesn't necessarily need to make the adjustment but users should be aware of the issue.

By Lori Garzio, on 5/14/19

CE05MOAS-GL320-05-CTDGVM000
Deployment: 1

Several suspect portions of profiles throughout the deployment.

By Lori Garzio, on 8/27/19

New Note

Metadata Start Date End Date Comment
CE05MOAS-GL320
10/5/14, 8:00 PM 12/28/14, 7:00 PM

Deployment 1 - Power consumption was greater than 1% per day and battery ran down to 10% before the end of the deployment. Glider was drifting before it was recovered.

Id: 890 By: michaesm
Flag: not_operational Exclude: No