Mobile Asset Controller

Reference Designator
GI05MOAS-GL484-00-ENG000000
Start Depth
0
End Depth
1,000
Location
Current Status
Engineering
Class
ENG00 (Mobile Asset Controller)
Series
ENG00-0
Science Discipline
Make
Teledyne Webb
Model
G2 Slocum Gliders
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/GI05MOAS/GL484/00-ENG000000/metadata
Method Data Stream Content Type
recovered_host glider_eng_metadata_recovered Metadata Report M2M Engineering
recovered_host glider_eng_recovered Engineering Data Report M2M Engineering
recovered_host glider_eng_sci_recovered Status Data Report M2M Engineering
recovered_host glider_gps_position GPS Position Data Report M2M Engineering
telemetered glider_eng_metadata Metadata Report M2M Engineering
telemetered glider_eng_sci_telemetered Status Data Report M2M Engineering
telemetered glider_eng_telemetered Engineering Data Report M2M Engineering
telemetered glider_gps_position GPS Position Data Report M2M Engineering
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
2 Review AT-30-01 08/17/2015 08/27/2015 CGVGI-05MOAS-00000 CGVEH-GLDROO-00484 CGCON-GLDROO-00484 59.86 -39.1317 1000 1000
3 Review AR-07-01 07/09/2016 10/19/2016 CGVGI-05MOAS-00000 CGVEH-GLDROO-00484 CGCON-GLDROO-00484 59.8592 -39.1321 1000 1000
Metadata Start Date End Date Comment
GI05MOAS

Glider optodes typically exhibit a sensor lag of 20-25 seconds. Example attached of several segments with consecutive down and up casts for CP05MOAS-GL335-04-DOSTAM000 on 10/26/2015 showing a typical measurement time lag. Profiles should be analyzed for individual time lags and data should be adjusted. OOI doesn't necessarily need to make the adjustment but users should be aware of the issue.

By Lori Garzio, on 5/31/19

GI05MOAS-GL484
Deployment: 2

Recovered data for deployment 2 should be ingested or annotated to explain why no recovered data are available for download. The ingest csv has a note that the glider was lost, but the glider was lost on deployment 3 not deployment 2.

By Lori Garzio, on 6/5/19

New Note

Metadata Start Date End Date Comment
GI05MOAS-GL484
8/17/15, 6:45 AM 8/26/15, 8:00 PM

Deployment 2: Deployed on 8/17/2015, recovered on 8/23/2015 at 12:26 UTC for ballast adjustment. Re-deployed at 12:40 UTC. Was recovered after 10 days due to rudder issues.

Id: 575 By: lgarzio

GI05MOAS-GL484
7/9/16, 6:32 AM 10/18/16, 6:06 PM

Glider went adrift and was not recovered. Only telemetered data are available.

Id: 164 By: lgarzio