Method | Data Stream | Content | Type | |
---|---|---|---|---|
recovered_host | spkir_abj_dcl_instrument_recovered | Data Products | Report M2M Stats | Science |
telemetered | spkir_abj_dcl_instrument | Data Products | Report M2M Stats | Science |
Deployment | Cruise | Start Date | Stop Date | Mooring Asset | Node Asset | Sensor Asset | Latitude | Longitude | Deployment Depth | Water Depth |
---|---|---|---|---|---|---|---|---|---|---|
1 Review | AT-26-29 | 02/18/2015 | 12/27/2015 | CGMGS-01SUMO-00001 | CGINS-SPKIRB-00276 | -54.4082 | -89.3576 | 12 | 4611 | |
2 Review | NBP-15-11 | 12/14/2015 | 12/12/2016 | CGMGS-01SUMO-00002 | CGINS-SPKIRB-00302 | -54.4041 | -89.2069 | 12 | 4588 | |
3 Review | NBP16-10 | 11/25/2016 | 12/09/2018 | CGMGS-01SUMO-00003 | CGINS-SPKIRB-00273 | -54.4076 | -89.3567 | 12 | 4612 | |
4 Review | DY096 | 12/04/2018 | 01/20/2020 | CGMGS-01SUMO-00004 | CGINS-SPKIRB-00291 | -54.4072 | -89.206 | 12 | 4589 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RID16-08-SPKIRB000 |
There is no pressure variable in the .nc files. This should be a coordinate. By Lori Garzio, on 7/12/19 |
||
GS01SUMO-RID16-08-SPKIRB000 Deployment: 1 |
All values for spkir_abj_cspp_downwelling_vector for this deployment are fill values. By Lori Garzio, on 7/12/19 |
||
GS01SUMO-RID16-08-SPKIRB000 Deployment: 2 |
35% of data are outside of global ranges for this deployment. Zooming in on the x-axis in the plots shows that all of the values that are outside of global ranges are negative. By Lori Garzio, on 7/12/19 |
||
GS01SUMO-RID16-08-SPKIRB000 Deployment: 2 |
9/1/16, 12:00 AM | 12/12/16, 7:58 AM |
Downwelling spectral irradiance should start increasing again in Sept (after the austral winter). This increase is observed to a certain extent in the data from this instrument at the end of 2016 for some wavelengths (555, 620nm), but not in the data from other wavelengths. This could indicate possible biofouling. Data are suspect - this should be investigated and annotated. By Lori Garzio, on 7/12/19 |
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RID16-08-SPKIRB000 |
12/14/15, 3:20 PM | 12/12/16, 2:58 AM |
Deployment 2: Bioshutter was missing at recovery. Id: 757 By: lgarzio |
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-RID16-08-SPKIRB000 |
10/21/18, 8:00 PM | 12/8/18, 11:42 PM |
Deployment 3: This instrument is known to have ceased sampling on 2018-10-22. No data are expected after this point. Root cause unknown.
Id: 2160
By: cdobson
|
GS01SUMO-RID16 |
2/3/19, 1:00 PM | 2/11/19, 7:00 AM |
Deployment 4: The NSIF experienced power failure on 2/3/19 1800UTC and power was restored on 2/11/19 1200UTC. All NSIF instruments will have this gap in their telemetered data. Id: 1577 By: cdobson |