Method | Data Stream | Content | Type | |
---|---|---|---|---|
recovered_host | flord_g_ctdbp_p_dcl_instrument_recovered | Data Products | Report M2M Stats | Science |
telemetered | flord_g_ctdbp_p_dcl_instrument | Data Products | Report M2M Stats | Science |
Deployment | Cruise | Start Date | Stop Date | Mooring Asset | Node Asset | Sensor Asset | Latitude | Longitude | Deployment Depth | Water Depth |
---|---|---|---|---|---|---|---|---|---|---|
2 Review | NBP-15-11 | 12/14/2015 | 12/12/2016 | CGMGS-01SUMO-00002 | CGINS-FLORDG-03966 | -54.4041 | -89.2069 | 80 | 4588 | |
3 Review | NBP16-10 | 11/25/2016 | 12/09/2018 | CGMGS-01SUMO-00003 | CGINS-FLORDG-04033 | -54.4076 | -89.3567 | 80 | 4612 | |
4 Review | DY096 | 12/04/2018 | 01/20/2020 | CGMGS-01SUMO-00004 | CGINS-FLORDG-03381 | -54.4072 | -89.206 | 80 | 4589 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-FLORDG032 |
There is no pressure variable in the netCDF files. This should be a coordinate. By Lori Garzio, on 3/22/19 |
||
GS01SUMO-RII11-02-FLORDG032 Deployment: 2 |
The automated valid data test was triggered due to the high percentage of data outside of global ranges for fluorometric_chlorophyll_a and total_volume_scattering_coefficient (negative values at the end of the data record. By Lori Garzio, on 3/22/19 |
||
GS01SUMO-RII11-02-FLORDG032 Deployment: 2 |
1/22/16, 12:00 AM | 12/12/16, 7:58 AM | |
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-FLORDG032 |
5/15/17, 8:00 PM | 12/8/18, 11:42 PM |
Deployment 3: The FLORDG032 is known to have ceased sampling on 2017-05-16. No telemetered or recovered data are expected after this date. Root cause unknown.
Id: 2148
By: cdobson
|
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-RII11-02-FLORDG032 |
12/4/18, 12:10 PM | 1/20/20, 5:01 AM |
Deployment 4: On recovery the shutter was stopped partially obscuring the lens. Id: 2216 By: swhite |