Spectral Irradiance

Reference Designator
GS01SUMO-SBD11-05-SPKIRB000
Start Depth
-5
End Depth
-5
Location
Buoy Tower
Current Status
Review Complete
Class
SPKIR (Spectral Irradiance)
Series
SPKIR-B
Science Discipline
Physical
Make
Satlantic
Model
OCR507 ICSW
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/GS01SUMO/SBD11/05-SPKIRB000/metadata
Method Data Stream Content Type
recovered_host spkir_abj_dcl_instrument_recovered Data Products Report M2M Stats Science
telemetered spkir_abj_dcl_instrument Data Products Report M2M Stats Science
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
1 Review AT-26-29 02/18/2015 12/27/2015 CGMGS-01SUMO-00001 CGINS-SPKIRB-00269 -54.4082 -89.3576 -6 4611
2 Review NBP-15-11 12/14/2015 12/12/2016 CGMGS-01SUMO-00002 CGINS-SPKIRB-00300 -54.4041 -89.2069 -6 4588
3 Review NBP16-10 11/25/2016 12/09/2018 CGMGS-01SUMO-00003 CGINS-SPKIRB-00272 -54.4076 -89.3567 -6 4612
4 Review DY096 12/04/2018 01/20/2020 CGMGS-01SUMO-00004 CGINS-SPKIRB-00290 -54.4072 -89.206 -6 4589
Metadata Start Date End Date Comment
GS01SUMO-SBD11-05-SPKIRB000

A substantial percentage (between 11-29%) of data are outside of global ranges for both deployments. Zooming in on the x-axis in the plots shows that all of the values that are outside of global ranges are negative.

By Lori Garzio, on 7/12/19

GS01SUMO-SBD11-05-SPKIRB000

Missing data should be annotated (e.g. the majority of deployment 1 isn't available).

By Lori Garzio, on 7/12/19

GS01SUMO
Deployment: 3

Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan."

By Lori Garzio, on 1/14/19

New Note

Metadata Start Date End Date Comment
GS01SUMO-SBD11
12/13/15, 7:00 PM 12/11/16, 7:00 PM

Upon recovery of deployment 2, damage to some components of the surface buoy were noted (e.g., FDCHP was bent, the tops of the METBK-PRC and FleetBroadBand antenna were missing).

Id: 94 By: lgarzio

GS01SUMO
12/8/17, 7:00 PM 12/8/18, 11:42 PM

Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan.

Id: 834 By: lgarzio

GS01SUMO-SBD11
11/30/19, 7:00 PM 12/2/19, 7:00 AM

Deployment 4: Data gap for part of the day on 12/1/2019 through 12/2/2019. Data will be available for instruments that collect internally.

Id: 1828 By: cdobson