3-Wavelength Fluorometer

Reference Designator
GS01SUMO-RID16-02-FLORTD000
Review Status
Review Complete
Note
Depth
12m
Class
FLORT (3-Wavelength Fluorometer)
Make / Model
WET Labs / ECO Triplet-w

Dataset Reviews Last processed: 3/14/19, 6:33 PM

QC Check Info
Dep. Preferred Method Stream DD FD SG EG Gaps GD TS Rate (s) Pressure Comp. Time Order Valid Data Missing Data Data Comp. Missing Coords. Review
1 recovered_host flort_sample 313 124 0 0 4 193 1,699,727 1 12 / Complete
2 recovered_host flort_sample 365 363 0 0 1 2 5,255,355 1 12 / 1 Complete
Data Ranges Review Images

Test Notes

  1. fail: data found in another stream (gaps: [1] days: [1])

Data Coverage

Deployment: 12
flort_sample 40%99%

Lat/Lon Differences (km)

Deployment: 12
1 0.00
2 9.790.00

System Annotations

Metadata Start Date End Date Comment
GS01SUMO
12/8/17, 7:00 PM 12/8/18, 11:42 PM

Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan.

Id: 834 By: lgarzio

GS01SUMO-RID16
2/3/19, 1:00 PM 2/11/19, 7:00 AM

Deployment 4: The NSIF experienced power failure on 2/3/19 1800UTC and power was restored on 2/11/19 1200UTC. All NSIF instruments will have this gap in their telemetered data.

Id: 1577 By: cdobson

Review Notes

Metadata Start Date End Date Comment
GS01SUMO-RID16-02-FLORTD000

pressure_depth (dbar) is an array of fill values in all files. This variable should contain valid pressure data from the collocated CTD.

By Lori Garzio, on 3/22/19

GS01SUMO-RID16-02-FLORTD000
Deployment: 1

Deployment 1 data gaps should be annotated.

By Lori Garzio, on 3/22/19

GS01SUMO
Deployment: 3

Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan."

By Lori Garzio, on 1/14/19