3-Wavelength Fluorometer

Reference Designator
GS01SUMO-RID16-02-FLORTD000
Start Depth
12
End Depth
12
Location
Near Surface Instrument Frame
Current Status
Review Complete
Class
FLORT (3-Wavelength Fluorometer)
Series
FLORT-D
Science Discipline
Biological
Make
WET Labs
Model
ECO Triplet-w
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/GS01SUMO/RID16/02-FLORTD000/metadata
Method Data Stream Content Type
recovered_host flort_sample Data Products Report M2M Stats Science
telemetered flort_sample Data Products Report M2M Stats Science
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
1 Review AT-26-29 02/18/2015 12/27/2015 CGMGS-01SUMO-00001 CGINS-FLORTD-01218 -54.4082 -89.3576 12 4611
2 Review NBP-15-11 12/14/2015 12/12/2016 CGMGS-01SUMO-00002 CGINS-FLORTD-01320 -54.4041 -89.2069 12 4588
3 Review NBP16-10 11/25/2016 12/09/2018 CGMGS-01SUMO-00003 CGINS-FLORTD-01217 -54.4076 -89.3567 12 4612
4 Review DY096 12/04/2018 01/20/2020 CGMGS-01SUMO-00004 CGINS-FLORTD-01116 -54.4072 -89.206 12 4589
Metadata Start Date End Date Comment
GS01SUMO-RID16-02-FLORTD000

pressure_depth (dbar) is an array of fill values in all files. This variable should contain valid pressure data from the collocated CTD.

By Lori Garzio, on 3/22/19

GS01SUMO-RID16-02-FLORTD000
Deployment: 1

Deployment 1 data gaps should be annotated.

By Lori Garzio, on 3/22/19

GS01SUMO
Deployment: 3

Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan."

By Lori Garzio, on 1/14/19

New Note

Metadata Start Date End Date Comment
GS01SUMO
12/8/17, 7:00 PM 12/8/18, 11:42 PM

Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan.

Id: 834 By: lgarzio

GS01SUMO-RID16
2/3/19, 1:00 PM 2/11/19, 7:00 AM

Deployment 4: The NSIF experienced power failure on 2/3/19 1800UTC and power was restored on 2/11/19 1200UTC. All NSIF instruments will have this gap in their telemetered data.

Id: 1577 By: cdobson