CTD (20 m)

Reference Designator
GS01SUMO-RII11-02-CTDMOQ011
Review Status
Review Complete
Note
Deployment 2 gap should be investigated
Depth
20m
Class
CTDMO (CTD Mooring (Inductive))
Make / Model
Sea-Bird / SBE 37IM

Dataset Reviews Last processed: 1/12/19, 1:30 AM

QC Check Info
Dep. Preferred Method Stream DD FD SG EG Gaps GD TS Rate (s) Pressure Comp. Time Order Valid Data Missing Data Data Comp. Missing Coords. Review
1 recovered_inst 313 313 0 0 0 0 59,826 450 20 / 20 Complete
2 recovered_inst 365 342 0 0 1 24 65,166 450 20 / 20 Complete
Data Ranges Review Images

Test Notes

All good!

Data Coverage

Deployment: 12
100%94%

Lat/Lon Differences (km)

Deployment: 12
1 0.00
2 9.790.00

System Annotations

Metadata Start Date End Date Comment
GS01SUMO-RII11-02-CTDMOQ011
7/9/17, 8:00 PM 12/8/18, 11:42 PM

Deployment 3: The CTDMOQ011 is known to have ceased sampling on 2018-04-07 and no data are expected after this date. A data gap is known to exist between 2017-10-27 and 2017-12-11 for telemetered and recovered_host data.

Id: 2137 By: cdobson
Flag: not_operational Exclude: No

GS01SUMO
12/8/17, 7:00 PM 12/8/18, 11:42 PM

Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan.

Id: 834 By: lgarzio

GS01SUMO-RII11-02-CTDMOQ011
12/4/18, 12:10 PM 1/20/20, 5:01 AM

Deployment 4: On recovery the instrument was missing the conductivity cell guard and the anti-foulant plugs.

Id: 2209 By: swhite

Review Notes

Metadata Start Date End Date Comment
GS01SUMO-RII11-02-CTDMOQ011
Deployment: 2
6/18/16, 2:00 PM 7/12/16, 3:45 PM

There is a 24 day gap in the data from 2016-06-18T14:00:01 to 2016-07-12T15:45:01 - this gap should either be filled in if the data are available, or annotated to inform users of the issue.

By Lori Garzio, on 2/6/19

GS01SUMO
Deployment: 3

Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan."

By Lori Garzio, on 1/14/19

New Note