Method | Data Stream | Content | Type | |
---|---|---|---|---|
recovered_host | ctdmo_ghqr_imodem_instrument_recovered | Data Products | Report M2M Stats | Science |
recovered_host | ctdmo_ghqr_imodem_metadata_recovered | Metadata | Report M2M | Engineering |
recovered_inst | ctdmo_ghqr_instrument_recovered | Data Products | Report M2M Stats | Science |
telemetered | ctdmo_ghqr_imodem_instrument | Data Products | Report M2M Stats | Science |
telemetered | ctdmo_ghqr_imodem_metadata | Metadata | Report M2M | Engineering |
Deployment | Cruise | Start Date | Stop Date | Mooring Asset | Node Asset | Sensor Asset | Latitude | Longitude | Deployment Depth | Water Depth |
---|---|---|---|---|---|---|---|---|---|---|
1 Review | AT-26-29 | 02/18/2015 | 12/27/2015 | CGMGS-01SUMO-00001 | CGINS-CTDMOQ-12304 | -54.4082 | -89.3576 | 20 | 4611 | |
2 Review | NBP-15-11 | 12/14/2015 | 12/12/2016 | CGMGS-01SUMO-00002 | CGINS-CTDMOQ-13558 | -54.4041 | -89.2069 | 20 | 4588 | |
3 Review | NBP16-10 | 11/25/2016 | 12/09/2018 | CGMGS-01SUMO-00003 | CGINS-CTDMOQ-08523 | -54.4076 | -89.3567 | 20 | 4612 | |
4 Review | DY096 | 12/04/2018 | 01/20/2020 | CGMGS-01SUMO-00004 | CGINS-CTDMOQ-12586 | -54.4072 | -89.206 | 20 | 4589 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-CTDMOQ011 Deployment: 2 |
6/18/16, 2:00 PM | 7/12/16, 3:45 PM | |
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-RII11-02-CTDMOQ011 |
7/9/17, 8:00 PM | 12/8/18, 11:42 PM |
Deployment 3: The CTDMOQ011 is known to have ceased sampling on 2018-04-07 and no data are expected after this date. A data gap is known to exist between 2017-10-27 and 2017-12-11 for telemetered and recovered_host data.
Id: 2137
By: cdobson
|
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-RII11-02-CTDMOQ011 |
12/4/18, 12:10 PM | 1/20/20, 5:01 AM |
Deployment 4: On recovery the instrument was missing the conductivity cell guard and the anti-foulant plugs. Id: 2209 By: swhite |