Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | recovered_inst | 313 | 313 | 0 | 0 | 0 | 0 | 59,826 | 450 | 60 / 60 | Complete | ||||||
2 | recovered_inst | 365 | 365 | 0 | 0 | 0 | 0 | 69,786 | 450 | 60 / 61 | Complete |
All good!
Deployment: | 1 | 2 |
---|---|---|
100% | 100% |
Deployment: | 1 | 2 |
---|---|---|
1 | 0.00 | |
2 | 9.79 | 0.00 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-RII11-02-CTDMOQ012 |
3/16/18, 8:00 PM | 12/8/18, 11:42 PM |
Deployment 3: The CTDMOQ012 is known to have ceased sampling on 2018-03-17 and no data are expected after this date. A data gap is known to exist between 2017-10-27 and 2017-12-11 for telemetered and recovered_host data.
Id: 2138
By: cdobson
|
GS01SUMO-RII11-02-CTDMOQ012 |
12/4/18, 12:10 PM | 1/20/20, 5:01 AM |
Deployment 4: The instrument was recovered at a depth of 80 m. On recovery the conductivity cell guard and anti-foulant plugs were missing; the conductivity cell was broken; the temperature probe was bent; and the pressure port plug screw was missing. The instrument stopped sampling due to low batteries on 2019-02-15. Id: 2210 By: swhite |
GS01SUMO-RII11-02-CTDMOQ012 |
2/14/19, 7:00 PM | 1/20/20, 5:01 AM |
UPDATED 2020-06-23: The instrument was recovered at a depth of 80 m. On recovery the conductivity cell guard and anti-foulant plugs were missing; the conductivity cell was broken; the temperature probe was bent; and the pressure port plug screw was missing. * Deployment 4: Frequent bad characters, invalid timestamps or unrealistic data present from 2019-02-15 onward. Id: 1612 By: cdobson |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |