CTD (60 m)

Reference Designator
GS01SUMO-RII11-02-CTDMOQ012
Start Depth
60
End Depth
60
Location
Fixed on Inductive Wire
Current Status
Review Complete
Class
CTDMO (CTD Mooring (Inductive))
Series
CTDMO-Q
Science Discipline
Physical
Make
Sea-Bird
Model
SBE 37IM
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/GS01SUMO/RII11/02-CTDMOQ012/metadata
Method Data Stream Content Type
recovered_host ctdmo_ghqr_imodem_instrument_recovered Data Products Report M2M Stats Science
recovered_host ctdmo_ghqr_imodem_metadata_recovered Metadata Report M2M Engineering
recovered_inst ctdmo_ghqr_instrument_recovered Data Products Report M2M Stats Science
telemetered ctdmo_ghqr_imodem_instrument Data Products Report M2M Stats Science
telemetered ctdmo_ghqr_imodem_metadata Metadata Report M2M Engineering
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
1 Review AT-26-29 02/18/2015 12/27/2015 CGMGS-01SUMO-00001 CGINS-CTDMOQ-12306 -54.4082 -89.3576 60 4611
2 Review NBP-15-11 12/14/2015 12/12/2016 CGMGS-01SUMO-00002 CGINS-CTDMOQ-13559 -54.4041 -89.2069 60 4588
3 Review NBP16-10 11/25/2016 12/09/2018 CGMGS-01SUMO-00003 CGINS-CTDMOQ-12302 -54.4076 -89.3567 60 4612
4 Review DY096 12/04/2018 01/20/2020 CGMGS-01SUMO-00004 CGINS-CTDMOQ-12589 -54.4072 -89.206 60 4589
Metadata Start Date End Date Comment
GS01SUMO
Deployment: 3

Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan."

By Lori Garzio, on 1/14/19

New Note

Metadata Start Date End Date Comment
GS01SUMO
12/8/17, 7:00 PM 12/8/18, 11:42 PM

Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan.

Id: 834 By: lgarzio

GS01SUMO-RII11-02-CTDMOQ012
3/16/18, 8:00 PM 12/8/18, 11:42 PM

Deployment 3: The CTDMOQ012 is known to have ceased sampling on 2018-03-17 and no data are expected after this date. A data gap is known to exist between 2017-10-27 and 2017-12-11 for telemetered and recovered_host data.

Id: 2138 By: cdobson
Flag: not_operational Exclude: No

GS01SUMO-RII11-02-CTDMOQ012
12/4/18, 12:10 PM 1/20/20, 5:01 AM

Deployment 4: The instrument was recovered at a depth of 80 m. On recovery the conductivity cell guard and anti-foulant plugs were missing; the conductivity cell was broken; the temperature probe was bent; and the pressure port plug screw was missing. The instrument stopped sampling due to low batteries on 2019-02-15.

Id: 2210 By: swhite

GS01SUMO-RII11-02-CTDMOQ012
2/14/19, 7:00 PM 1/20/20, 5:01 AM

UPDATED 2020-06-23: The instrument was recovered at a depth of 80 m. On recovery the conductivity cell guard and anti-foulant plugs were missing; the conductivity cell was broken; the temperature probe was bent; and the pressure port plug screw was missing. * Deployment 4: Frequent bad characters, invalid timestamps or unrealistic data present from 2019-02-15 onward.

Id: 1612 By: cdobson