2-Wavelength Fluorometer (40m)

Reference Designator
GS01SUMO-RII11-02-FLORDG031
Review Status
Review Complete
Note
There are no data from deployment 2 available for download from uFrame.
Depth
40m
Class
FLORD (2-Wavelength Fluorometer)
Make / Model
WET Labs / ECO FLBB-SB

Dataset Reviews Last processed:

QC Check Info
Dep. Preferred Method Stream DD FD SG EG Gaps GD TS Rate (s) Pressure Comp. Time Order Valid Data Missing Data Data Comp. Missing Coords. Review
2 recovered_host / Blocked
Data Ranges Review Images

Test Notes

All good!

System Annotations

Metadata Start Date End Date Comment
GS01SUMO-RII11-02-FLORDG031
1/27/17, 7:00 PM 12/8/18, 11:42 PM

Deployment 3: The FLORDG031 is known to have ceased sampling on 2017-01-28. No data are expected after this date. Root cause unknown.

Id: 2150 By: cdobson
Flag: not_operational Exclude: No

GS01SUMO
12/8/17, 7:00 PM 12/8/18, 11:42 PM

Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan.

Id: 834 By: lgarzio

GS01SUMO-RII11-02-FLORDG031
12/5/18, 11:19 AM 1/20/20, 5:01 AM

Deployment 4: Data telemetery ceased 12/5/2018. The instrument was not recovered; no telemetered or recovered data.

Id: 2044 By: swhite

Review Notes

Metadata Start Date End Date Comment
GS01SUMO-RII11-02-FLORDG031
Deployment: 2

There are no recovered_host or telemetered data available for download from this instrument for deployment 2. There should be an annotation in the system indicating why there are no data available.

By Lori Garzio, on 1/15/19

GS01SUMO
Deployment: 3

Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan."

By Lori Garzio, on 1/14/19

New Note