2-Wavelength Fluorometer (40m)

Reference Designator
GS01SUMO-RII11-02-FLORDG031
Start Depth
40
End Depth
40
Location
Fixed on Inductive Wire
Current Status
Review Complete
Class
FLORD (2-Wavelength Fluorometer)
Series
FLORD-G
Science Discipline
Biological
Make
WET Labs
Model
ECO FLBB-SB
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/GS01SUMO/RII11/02-FLORDG031/metadata
Method Data Stream Content Type
recovered_host flord_g_ctdbp_p_dcl_instrument_recovered Data Products Report M2M Stats Science
telemetered flord_g_ctdbp_p_dcl_instrument Data Products Report M2M Stats Science
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
2 Review NBP-15-11 12/14/2015 12/12/2016 CGMGS-01SUMO-00002 CGINS-FLORDG-03965 -54.4041 -89.2069 40 4588
3 Review NBP16-10 11/25/2016 12/09/2018 CGMGS-01SUMO-00003 CGINS-FLORDG-04032 -54.4076 -89.3567 40 4612
4 Review DY096 12/04/2018 01/20/2020 CGMGS-01SUMO-00004 CGINS-FLORDG-03369 -54.4072 -89.206 40 4589
Metadata Start Date End Date Comment
GS01SUMO-RII11-02-FLORDG031
Deployment: 2

There are no recovered_host or telemetered data available for download from this instrument for deployment 2. There should be an annotation in the system indicating why there are no data available.

By Lori Garzio, on 1/15/19

GS01SUMO
Deployment: 3

Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan."

By Lori Garzio, on 1/14/19

New Note

Metadata Start Date End Date Comment
GS01SUMO-RII11-02-FLORDG031
1/27/17, 7:00 PM 12/8/18, 11:42 PM

Deployment 3: The FLORDG031 is known to have ceased sampling on 2017-01-28. No data are expected after this date. Root cause unknown.

Id: 2150 By: cdobson
Flag: not_operational Exclude: No

GS01SUMO
12/8/17, 7:00 PM 12/8/18, 11:42 PM

Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan.

Id: 834 By: lgarzio

GS01SUMO-RII11-02-FLORDG031
12/5/18, 11:19 AM 1/20/20, 5:01 AM

Deployment 4: Data telemetery ceased 12/5/2018. The instrument was not recovered; no telemetered or recovered data.

Id: 2044 By: swhite