Dep. | Preferred Method | Stream | DD | FD | SG | EG | Gaps | GD | TS | Rate (s) | Pressure Comp. | Time Order | Valid Data | Missing Data | Data Comp. | Missing Coords. | Review |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | recovered_host | flort_sample | 313 | 268 | 0 | 0 | 3 | 48 | 3,706,779 | 1 | 1 / | Complete | |||||
2 | recovered_host | flort_sample | 365 | 355 | 0 | 0 | 3 | 10 | 4,662,394 | 1 | 1 / | 1 | Complete |
Deployment: | 1 | 2 |
---|---|---|
flort_sample | 86% | 97% |
Deployment: | 1 | 2 |
---|---|---|
1 | 0.00 | |
2 | 9.79 | 0.00 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-SBD12 |
12/13/15, 7:00 PM | 12/11/16, 7:00 PM |
Upon recovery of deployment 2, damage to some components of the surface buoy were noted (e.g., FDCHP was bent, the tops of the METBK-PRC and FleetBroadBand antenna were missing). Id: 95 By: lgarzio |
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |
GS01SUMO-SBD12-02-FLORTD000 |
5/1/19, 8:00 PM | 1/20/20, 5:01 AM |
Deployment 4: There have been some gaps in the telemetered FLORD data beginning 2019-05-02. Root cause still to be determined. Id: 1584 By: cdobson |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-SBD12-02-FLORTD000 |
pressure_depth (dbar) is an array of fill values in all files. It's unclear if this variable should contain valid data, or if it's assumed that the pressure is 1 because this instrument is on the surface buoy. By Lori Garzio, on 3/22/19 |
||
GS01SUMO-SBD12-02-FLORTD000 Deployment: 2 |
7/1/16, 12:00 AM | 12/12/16, 7:58 AM | |
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |