Hydrogen Sensor

Reference Designator
GS01SUMO-SBD12-03-HYDGN0000
Start Depth
0
End Depth
0
Location
Buoy Well
Current Status
Engineering
Class
HYDGN (Hydrogen Sensor)
Series
HYDGN-0
Science Discipline
Make
RKI Instruments
Model
M2A transmitters
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/GS01SUMO/SBD12/03-HYDGN0000/metadata
Method Data Stream Content Type
recovered_host hyd_o_dcl_instrument_recovered Engineering Data Report M2M Engineering
telemetered hyd_o_dcl_instrument Engineering Data Report M2M Engineering
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
1 Review AT-26-29 02/18/2015 12/27/2015 CGMGS-01SUMO-00001 CGINS-HYDGN0-99999 -54.4082 -89.3576 0 4611
2 Review NBP-15-11 12/14/2015 12/12/2016 CGMGS-01SUMO-00002 CGINS-HYDGN0-42356 -54.4041 -89.2069 0 4588
3 Review NBP16-10 11/25/2016 12/09/2018 CGMGS-01SUMO-00003 CGINS-HYDGN0-49891 -54.4076 -89.3567 0 4612
4 Review DY096 12/04/2018 01/20/2020 CGMGS-01SUMO-00004 CGINS-HYDGN0-42406 -54.4072 -89.206 0 4589
Metadata Start Date End Date Comment
GS01SUMO-SBD12-03-HYDGN0000
Deployment: 1
2/18/15, 12:00 AM 12/27/15, 12:00 AM

Recovered data were not archived and are not available.

By Lori Garzio, on 3/16/17
Redmine Issue #10636

GS01SUMO
Deployment: 3

Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan."

By Lori Garzio, on 1/14/19

New Note

Metadata Start Date End Date Comment
GS01SUMO-SBD12
12/13/15, 7:00 PM 12/11/16, 7:00 PM

Upon recovery of deployment 2, damage to some components of the surface buoy were noted (e.g., FDCHP was bent, the tops of the METBK-PRC and FleetBroadBand antenna were missing).

Id: 95 By: lgarzio

GS01SUMO
12/8/17, 7:00 PM 12/8/18, 11:42 PM

Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan.

Id: 834 By: lgarzio