Method | Data Stream | Content | Type | |
---|---|---|---|---|
recovered_host | hyd_o_dcl_instrument_recovered | Engineering Data | Report M2M | Engineering |
telemetered | hyd_o_dcl_instrument | Engineering Data | Report M2M | Engineering |
Deployment | Cruise | Start Date | Stop Date | Mooring Asset | Node Asset | Sensor Asset | Latitude | Longitude | Deployment Depth | Water Depth |
---|---|---|---|---|---|---|---|---|---|---|
1 Review | AT-26-29 | 02/18/2015 | 12/27/2015 | CGMGS-01SUMO-00001 | CGINS-HYDGN0-99999 | -54.4082 | -89.3576 | 0 | 4611 | |
2 Review | NBP-15-11 | 12/14/2015 | 12/12/2016 | CGMGS-01SUMO-00002 | CGINS-HYDGN0-42356 | -54.4041 | -89.2069 | 0 | 4588 | |
3 Review | NBP16-10 | 11/25/2016 | 12/09/2018 | CGMGS-01SUMO-00003 | CGINS-HYDGN0-49891 | -54.4076 | -89.3567 | 0 | 4612 | |
4 Review | DY096 | 12/04/2018 | 01/20/2020 | CGMGS-01SUMO-00004 | CGINS-HYDGN0-42406 | -54.4072 | -89.206 | 0 | 4589 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-SBD12-03-HYDGN0000 Deployment: 1 |
2/18/15, 12:00 AM | 12/27/15, 12:00 AM |
Recovered data were not archived and are not available.
By Lori Garzio,
on 3/16/17
|
GS01SUMO Deployment: 3 |
Annotation ID 834 needs to be updated: "Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan." By Lori Garzio, on 1/14/19 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO-SBD12 |
12/13/15, 7:00 PM | 12/11/16, 7:00 PM |
Upon recovery of deployment 2, damage to some components of the surface buoy were noted (e.g., FDCHP was bent, the tops of the METBK-PRC and FleetBroadBand antenna were missing). Id: 95 By: lgarzio |
GS01SUMO |
12/8/17, 7:00 PM | 12/8/18, 11:42 PM |
Deployment 3: *UPDATED 2020-04-28: This mooring was recovered 2018-12-09 which was a year later than originally intended. Some instruments were able to continue sampling for the extended deployment.* Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |