Method | Data Stream | Content | Type | |
---|---|---|---|---|
recovered_host | flort_sample | Data Products | Report M2M Stats | Science |
telemetered | flort_sample | Data Products | Report M2M Stats | Science |
Deployment | Cruise | Start Date | Stop Date | Mooring Asset | Node Asset | Sensor Asset | Latitude | Longitude | Deployment Depth | Water Depth |
---|---|---|---|---|---|---|---|---|---|---|
1 Review | KN-221-4 | 09/16/2014 | 08/20/2015 | CGMGI-03FLMB-00001 | CGINS-FLORTD-01107 | 59.7127 | -39.2302 | 30 | 2825 | |
2 Review | AT-30-01 | 08/21/2015 | 07/18/2016 | CGMGI-03FLMB-00002 | CGINS-FLORTD-01299 | 59.7182 | -39.3536 | 30 | 2812 | |
3 Review | AR-07-01 | 07/13/2016 | 08/11/2017 | CGMGI-03FLMB-00003 | CGINS-FLORTD-01122 | 59.7155 | -39.3148 | 30 | 2825 | |
4 Review | AR21 | 08/07/2017 | 06/11/2018 | CGMGI-03FLMB-00004 | CGINS-FLORTD-01318 | 59.7166 | -39.3521 | 30 | 2817 | |
5 Review | AR30-03 | 06/11/2018 | 08/10/2019 | CGMGI-03FLMB-00005 | CGINS-FLORTD-01320 | 59.7143 | -39.3133 | 30 | 2829 | |
6 Review | AR35-05 | 08/08/2019 | CGMGI-03FLMB-00006 | CGINS-FLORTD-01221 | 59.7205 | -39.3547 | 30 | 2819 |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GI03FLMB-RIS01-05-FLORTD000 |
pressure_depth (dbar) is an array of all fill values for every deployment. This variable should contain valid pressure data. By Lori Garzio, on 1/10/19 |
||
GI03FLMB-RIS01-05-FLORTD000 Deployment: 1 |
6/15/15, 12:00 AM | 8/20/15, 12:56 PM |
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GI03FLMB-RIS01-05-FLORTD000 |
9/16/14, 9:24 AM | 8/20/15, 8:56 AM |
Deployment 1: Upon recovery of the instrument, the wiper to prevent biofouling was stopped over the sensing windows. This possibly broke in mid-June 2015. Id: 562 By: lgarzio |
GI03FLMB |
9/16/14, 9:24 AM | 8/20/15, 8:56 AM |
Deployment 1: Mooring was deployed 5-10m shallower than planned. Id: 1451 By: lgarzio |
GI03FLMB-RIS01 |
8/21/15, 1:11 PM | 7/17/16, 8:00 PM |
Deployment 2: Low battery warnings from the mooring controller were sent via satellite telemetry starting in early Nov 2015, controller failed. Id: 561 By: lgarzio |
GI03FLMB |
8/21/15, 1:11 PM | 7/17/16, 8:00 PM |
Deployment 2: Mooring was deployed 5m deeper than planned. Id: 1452 By: lgarzio |
GI03FLMB-RIS01 |
8/21/15, 1:11 PM | 7/17/16, 8:00 PM |
Deployment 2: Secondary controller failed - no leak was detected, but the battery appears to have drained a few days after the deployment. No recovered_host or telemetered data expected. Id: 691 By: lgarzio |
GI03FLMB-RIS01 |
10/9/16, 6:00 PM | 12/17/16, 8:00 PM |
Deployment 3: Secondary controller failed - no recovered_host or telemetered data expected. Id: 695 By: lgarzio |
GI03FLMB-RIS01 |
1/12/17, 1:15 PM | 8/11/17, 8:02 AM |
Deployment 3: Secondary controller failed - no leak was detected, but the battery for the controller board was drained at recovery. No recovered_host or telemetered data expected. Id: 696 By: lgarzio |
GI03FLMB |
8/7/17, 11:49 AM | 6/11/18, 3:36 PM |
Deployment 4: Mooring was deployed 10-15m deeper than planned. Id: 1453 By: lgarzio |